Indias Chandrayaan-3 rover deploy and first tracks @collectspace
Indias Chandrayaan-3 rover deploy and first tracks  @collectspace
Uploaded August 2023 | Updated September 2026, 1 hour ago
collectSPACE.com — On Aug. 23, 2023, after landing safely on the moon in the south polar region, India's Chandraayan-3 lander deployed a two-segment ramp to facilitate the roll-down of its rover. A solar panel on the rover was then deployed to enable it to generate power.

Soon after, the Chandrayaan-3 rover ramped down from the lander to the lunar surface.

Video credit: Indian Space Research Organization (ISRO).
Indias Chandrayaan-3 rover deploy and first tracksSTS-133: Pilot point of view of Discoverys last launchRockets rising outside Space Shuttle Atlantis exhibitU.S. Astronaut Hall of Fame 2020/21 induction ceremony[STS-135 Flight Day Journal] Flight Day 8 RecapGravity reality check: Alfonso Cuarón and Sandra Bullock talk fact vs. fictionDM-2: NASA/ATK test fires five-segment solid rocket motorFrom the Moon to Sphere | Columbia SportswearKinect with NASAs Curiosity: Mars Rover Landing for Xbox 360SpaceX COTS Demo-1 Flight HighlightsUnited Launch Alliance: 5 Years, 56 Launches[NASA] Meet Orion: Join Our Team
collectSPACE |

India's Chandrayaan-3 rover deploy and first tracks

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER