Uploaded November 2026 | Updated November 2026, 6 hours ago
A pavement separation at the bridge joint shut down southbound I-285 near South Cobb Drive for hours. GDOT says there are no structural issues; temporary repairs are in place, with permanent work planned next month.
A pavement separation at the bridge joint shut down southbound I-285 near South Cobb Drive for hours. GDOT says there are no structural issues; temporary repairs are in place, with permanent work planned next month.










