@The2ndEmpireStrikesBack
  @The2ndEmpireStrikesBack
The 2nd Empire Strikes Back | I Still Can't Believe Someone Painted This Mantel - Victorian Home Restoration EP 42 @The2ndEmpireStrikesBack | Uploaded November 2021 | Updated October 2024, 13 hours ago.
Quite a few tasks this week. Finished what will have to be the end of the stripping on the front of the building as the weather is getting too cold for the stripper to work. Ripped a lot of the old electrical out of the way for my new lines. Removed all of the chandeliers from the first floor to make room for new wires. Lastly I stripped the rest of the fireplace mantle in the library with a heat gun. Which ended up being a real stunner. Enjoy!
#adandoned #howto #mansion

Hall and Brown/SESB Merch: teespring.com/stores/the-2nd-empire-strikes-back
Kim's Channel: youtube.com/channel/UCvyfozDsB8VVQyVs66Pu9ng

P.O. Box
The 2nd Empire Strikes Back
PO Box 2601
St Louis, MO 63116

Patreon: patreon.com/thesecondempirestrikesback
Instagram: instagram.com/the_2nd_empire_strikes_back
Tiktok: tiktok.com/@the2ndempirestrikesback

For Business Inquiries please email us at the2ndempirestrikesback@gmail.com

Campbell House: campbellhousemuseum.org
^^^Seriously if you visit St. Louis and love all things Victorian go here^^^

Music: bensound.com/royalty-free-music

Completed Projects (2021): New Roof, New Water Service, New Windows (Partial), Boiler Work, Sewer Lateral, Tuckpointing, Plaster Repair (Partial), Wood Floors (Partial), Electric Service (Partial)

Projects to Complete in 2022: Limestone Restoration of Front Elevation, Rebuild Mansard, New Windows (Partial), Complete Plaster Work (2nd Floor and Back Hallway 1st Floor, Kitchen and Dining Room), Plumbing Stacks and Rough in Plumbing, Complete Electric, HVAC (Basement and 1st Floor), High Velocity AC and Heat (2nd Floor), Mini Splits (3rd Floor), Framing on 3rd Floor, Rebuild of Front Cornice Work and Copper Gutter System, Rebuilding of Dormers

Projects to Complete in 2023: Hallways and Stairwells (Plaster Repair, Floors, Stringers of Stairwell Reinforment), Completion of Windows (1st and 3rd Floors), Parlors (Including Fireplace Mantels, and Pocket Doors, and Decorative Fretwork, Completion of 3 Floor Bathroom and Main Suite
I Still Cant Believe Someone Painted This Mantel - Victorian Home Restoration EP 42No More Paint!.. S3 EP42Its TOO HOT in my house!. Problem Window No Longer a Problem!  EP 26Its a ROYAL FLUSH! Abandoned Victorian Mansion S2 EP20Abandoned Victorian Mansion - Future Library Tour #shortsAnd We Are Back!!  S3 EP37This Room Is Going To Be Amazing! S3 EP15Removing Rotten Flooring #shortsAbandoned Victorian Mansion Tour - Entry Way #shortsThe Lucky One #shortsA House Built Like A Car?! The 50s Home Of the Future! Tour Time!Antique Plumbing Means Getting Creative  S2 EP19

I Still Can't Believe Someone Painted This Mantel - Victorian Home Restoration EP 42 @The2ndEmpireStrikesBack

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER