GoGun | Hydraulic Routing (Behind The Scenes) @GoGunCo | Uploaded 7 years ago | Updated 4 minutes ago
We're in the home stretch of assembling the Mk.III, and that means it's time to replace all our temporary test hoses in the track base with the final product - hydraulic hard line! In this Behind The Scenes video, Jon walks us through the final design of the track base hydraulic layout.
We're in the home stretch of assembling the Mk.III, and that means it's time to replace all our temporary test hoses in the track base with the final product - hydraulic hard line! In this Behind The Scenes video, Jon walks us through the final design of the track base hydraulic layout.