Uploaded July 2026 | Updated November 2026, 2 days ago
The structural completion of the 700-metre Burton Green tunnel, near Kenilworth, is a significant milestone on the West Midlands section of HS2. New drone footage shows it is now possible to walk the full length of the completed structure for the first time.
The cut-and-cover tunnel will carry high-speed trains beneath Burton Green village. Its twin-box design separates trains heading north towards Birmingham, Manchester and Scotland from those heading south towards Old Oak Common and London Euston.
The next phase is the installation of a 500-metre green roof. Native trees and shrubs will be planted to blend the structure into the surrounding landscape, create biodiverse habitats, and re-establish vegetated connections to Black Waste Wood and Little Poors Wood. Excavated material from the tunnel is being reused for landscaping, keeping sustainability central to delivery.
Once complete, the Kenilworth Greenway will be reinstated close to its original alignment above the tunnel, providing a route from Balsall Common to Kenilworth via Burton Green for walkers, cyclists, and horse-riders. HS2's construction partner Balfour Beatty VINCI is already working with local community groups and schools to shape the Greenway experience and celebrate the area's landscape, ecology, and heritage.
In this video:
โข How the Burton Green tunnel was built and what makes it structurally unique
โข The sustainability approach behind reusing excavated material on site
โข What the 500-metre green roof will look like and how it will benefit local wildlife
โข How the tunnel will reconnect Burton Green village and reinstate the Kenilworth Greenway
Burton Green is one of five cut-and-cover tunnels on the HS2 route between London and the West Midlands. The others are Copthall in outer London, Wendover in Buckinghamshire, and Chipping Warden and Greatworth in Northamptonshire.
๐ข Subscribe for the latest news and updates from our high-speed railway, HS2.
Follow us on social media:
๐ผ X: twitter.com/HS2ltd
๐ธ Instagram: instagram.com/hs2ltd
๐ Facebook: facebook.com/HS2ltd
๐ LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
00:00 - Introduction to Burton Green Tunnel
00:18 - Celebrating the structural completion milestone
00:26 - The purpose and design of the green tunnel
00:39 - Overview of construction techniques
00:52 - Next steps: Finishing works and fireproofing
01:06 - Visualising the finished green roof and landscape
01:23 - Collaborative teamwork on HS2
#HS2 #Engineering #Construction #Infrastructure #Tunnel #CivilEngineering #Railways #WestMidlands #Kenilworth
Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
๐ Call: 08081 434 434
๐ง Email: hs2enquiries@hs2.org.uk
The structural completion of the 700-metre Burton Green tunnel, near Kenilworth, is a significant milestone on the West Midlands section of HS2. New drone footage shows it is now possible to walk the full length of the completed structure for the first time.
The cut-and-cover tunnel will carry high-speed trains beneath Burton Green village. Its twin-box design separates trains heading north towards Birmingham, Manchester and Scotland from those heading south towards Old Oak Common and London Euston.
The next phase is the installation of a 500-metre green roof. Native trees and shrubs will be planted to blend the structure into the surrounding landscape, create biodiverse habitats, and re-establish vegetated connections to Black Waste Wood and Little Poors Wood. Excavated material from the tunnel is being reused for landscaping, keeping sustainability central to delivery.
Once complete, the Kenilworth Greenway will be reinstated close to its original alignment above the tunnel, providing a route from Balsall Common to Kenilworth via Burton Green for walkers, cyclists, and horse-riders. HS2's construction partner Balfour Beatty VINCI is already working with local community groups and schools to shape the Greenway experience and celebrate the area's landscape, ecology, and heritage.
In this video:
โข How the Burton Green tunnel was built and what makes it structurally unique
โข The sustainability approach behind reusing excavated material on site
โข What the 500-metre green roof will look like and how it will benefit local wildlife
โข How the tunnel will reconnect Burton Green village and reinstate the Kenilworth Greenway
Burton Green is one of five cut-and-cover tunnels on the HS2 route between London and the West Midlands. The others are Copthall in outer London, Wendover in Buckinghamshire, and Chipping Warden and Greatworth in Northamptonshire.
๐ข Subscribe for the latest news and updates from our high-speed railway, HS2.
Follow us on social media:
๐ผ X: twitter.com/HS2ltd
๐ธ Instagram: instagram.com/hs2ltd
๐ Facebook: facebook.com/HS2ltd
๐ LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
00:00 - Introduction to Burton Green Tunnel
00:18 - Celebrating the structural completion milestone
00:26 - The purpose and design of the green tunnel
00:39 - Overview of construction techniques
00:52 - Next steps: Finishing works and fireproofing
01:06 - Visualising the finished green roof and landscape
01:23 - Collaborative teamwork on HS2
#HS2 #Engineering #Construction #Infrastructure #Tunnel #CivilEngineering #Railways #WestMidlands #Kenilworth
Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
๐ Call: 08081 434 434
๐ง Email: hs2enquiries@hs2.org.uk










