HS2 Steelwork Junctions – High-Level Access with Proscaf @SafeSmartAccess
HS2 Steelwork Junctions – High-Level Access with Proscaf  @SafeSmartAccess
Uploaded November 2025 | Updated September 2026, 1 hour ago
See how our team tackled one of the most complex access challenges on the High Speed 2 (HS2) project.

Traditional scaffolding couldn't meet the safety and logistical demands of working platforms up to 20 metres high on intricate steelwork junctions. We needed a solution that was safe, cost-effective, and could stand on its own without extensive ties.

Find out how we tackled this challengeβ€”the better way.

🌐 safesmartaccess.co.uk
HS2 Steelwork Junctions – High-Level Access with ProscafDeck to Ledger Tubular U-TypeInternal Walkway Gantry | ProscafData Centre Access Solutions with AdaptaPanel WorkThru | SafeSmartWelcome to the SafeSmart Headquarters!Chatswood Chase Public Access Stair | ProscafBridging between Islands with AdaptaSpan | Rangitoto IslandProscaf Component Snapshot Series - Episode 7 - Adjustable Guardrail LedgerIntermediate Hop-upIntroducing Z-Stack | The Modular Stair SystemDiscover the Power of EasyRaise | SafeSmart Access UKSafeSmart maintenance and working platforms used at Fairfax Industries
SafeSmart Access |

HS2 Steelwork Junctions – High-Level Access with Proscaf

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER