Once both sides of the frame were built, it was time to connect them together and prepare for the joists.

We installed joist hangers to make the joist installation quicker and easier later on. Most of the joists were spaced around 16 inches apart, with the first and last joists sitting closer to 12 inches from the ends to line up with the inset TuffBlocks.

Just like the first stage, each block was levelled with compacted base and gravel underneath. Depending on the slope of the ground, some posts needed to be higher than others, but none should sit above the joists themselves.

#buildtuff #tuffblock #deckbuild #deckframing #deckfoundation #joisthangers #diydeck #backyardrenovation #deckblocks #outdoorliving
How We Connected the Frame and Set the Joist LayoutDo I Need Inspector Approval to us TuffBlocks?How To Build A Ground Deck On A Slope: Finishing the Fascia  #diy #woodworking #toolsPlanning & Prep | Squareshed x TuffBlockAdd Value to Your Home: Easy Deck Installation Guide #diy #homedecor #landscapedesignTuffBlock: The Ultimate Deck Block For DIY projectsThis One Step Makes Deck Framing Way EasierUsing Joist Hangers + Load Bearing Joists = Max Efficiency @humediySolo DIYer Built 5 Floating Decks To Transform His Yard #diy #deckbuilding #landscapedesignUsing Blocks to Build an Instant Deck FoundationThis floating deck transformed my yard! Super easy with TuffBlock.How To Prepare Ground For A Floating Ground Deck #deckbuilding #landscapedesign #diyprojects
BuildTuff |

How We Connected the Frame and Set the Joist Layout

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER