Uploaded October 2025 | Updated September 2026, 3 weeks ago
The Perkins Brothers are laying out the next row of footings — 5 feet (1.5m) out from the house to support the center of the deck. Since this build uses 2x6s (45mm x 140mm), the middle needs extra support for the 10-foot (3m) span. The final row of footings is set 9’8” (3m) out, keeping everything lined up 4" (100mm) in from the deck edge.
To follow along the full build, click the link in the comments.
#floatingdecks #buildtuff #tuffblock #builtbytuffblock #deck #deckdesign #deckbuild #timber #deckfootings #foundationsystem #garden #gardendesign #renovation #backyardrenovation #DIY #trade #tools #deckblock #deckblocks #lowprofiledeck #deckdesign #diydeck #diydecks #deckdesigns #lowes #floatingdeck #floatingdecks
The Perkins Brothers are laying out the next row of footings — 5 feet (1.5m) out from the house to support the center of the deck. Since this build uses 2x6s (45mm x 140mm), the middle needs extra support for the 10-foot (3m) span. The final row of footings is set 9’8” (3m) out, keeping everything lined up 4" (100mm) in from the deck edge.
To follow along the full build, click the link in the comments.
#floatingdecks #buildtuff #tuffblock #builtbytuffblock #deck #deckdesign #deckbuild #timber #deckfootings #foundationsystem #garden #gardendesign #renovation #backyardrenovation #DIY #trade #tools #deckblock #deckblocks #lowprofiledeck #deckdesign #diydeck #diydecks #deckdesigns #lowes #floatingdeck #floatingdecks










