How to Install a GreenMAX DRC Touch Screen (TS004) @leviton
How to Install a GreenMAX DRC Touch Screen (TS004)  @leviton
Uploaded April 2026 | Updated September 2026, 2 weeks ago
Install a GreenMAX DRC Touch Screen (TS004) quickly and correctly. This video shows how simple it is to mount the touch screen, make the correct connections, and confirm it’s ready for commissioning as part of a Leviton GreenMAX DRC system.

Learn more about the GreenMAX DRC Touch Screen at Leviton.com/greenmaxdrc.
How to Install a GreenMAX DRC Touch Screen (TS004)Under A Minute – Leviton Inform Technology in Industrial Switches: Part 4Leviton Load Center Lowdown | Line Side PowerThe Future Is OnWhat are Partial-ON and Partial-OFF Lighting Controls?Beyond Bandwidth Season 1 | Episode 1: What’s the Deal with DAS?How to Install Leviton Smart Ceiling Mount SensorsBest Electrical Panel for Your Project? (Leviton Load Center Tips) #electricalpanel #tech #techtokLeviton Front-loading UTP QuickPort Patch Panel: Front - MAC WorkWhy Use SubmeteringV-Rail Illuminated Handrail SystemSecure Snap Mounting in STRUCTURED MEDIA Centers
Leviton |

How to Install a GreenMAX DRC Touch Screen (TS004)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER