Live testing for external earth fault loop impedance on a 3 phase supply. This test is demonstrated on a live 3 phase distribution board and will help with AM2 and AM2S exams. As always preparing for your end skills test AM2, AM2S or AM2E requires time testing at college and on-site experience of testing electrical circuits.
🔔 Subscribe for more free electrical training videos youtube.com/c/GSHElectrical?sub_confirmation=1
Electrical UK Wiring
NOTE - Your end point assessment AM2 and AM2S will require you to have the main switch locked off, sign in place and key In your pocket during this test 👍🏻.
🔵 Testing for External Earth Fault Loop Impedance (Ze) When You Have a Main Earthing Terminal (MET) youtu.be/nz3scSSg3ZU
🔵 First Live Test AM2 & AM2S - Check Polarity of 3 Phase Supply, Using an Approved Voltage Indicator youtu.be/3kHlWHM9Wm8
== 🕐 Time Stamps - Cut to the action 🕕 ==
00:00 - External earth fault loop impedance
00:42 - Loads off now the main switch
00:53 - Why remove the Earthing conductor
01:28 - It's still LIVE
01:41 - Our tester
02:25 - The test
03:23 - The results
Videos are training aids for City and Guilds (C and G) and EAL courses Level 1, 2, 3 plus AM2, AM2S and AM2E.
You can follow me day by day on Facebook, Instagram, Twitter and TikTok lookout for "GSH Electrical”.
▶️ FACEBOOK facebook.com/gshelectrical
▶️ INSTAGRAM instagram.com/p/BrIhZmrAYGDTmjMdb9lUNQodMevqsbDDki3qpQ0
▶️ TWITTER mobile.twitter.com/gsh_electrical
▶️ TikTok vm.tiktok.com/ZMRBLFdhe
#GSHElectrical #Electricaltrainingvideos #electricaltesting #am2 #tncs
Live testing for external earth fault loop impedance on a 3 phase supply. This test is demonstrated on a live 3 phase distribution board and will help with AM2 and AM2S exams. As always preparing for your end skills test AM2, AM2S or AM2E requires time testing at college and on-site experience of testing electrical circuits.
🔔 Subscribe for more free electrical training videos youtube.com/c/GSHElectrical?sub_confirmation=1
Electrical UK Wiring
NOTE - Your end point assessment AM2 and AM2S will require you to have the main switch locked off, sign in place and key In your pocket during this test 👍🏻.
🔵 Testing for External Earth Fault Loop Impedance (Ze) When You Have a Main Earthing Terminal (MET) youtu.be/nz3scSSg3ZU
🔵 First Live Test AM2 & AM2S - Check Polarity of 3 Phase Supply, Using an Approved Voltage Indicator youtu.be/3kHlWHM9Wm8
== 🕐 Time Stamps - Cut to the action 🕕 ==
00:00 - External earth fault loop impedance
00:42 - Loads off now the main switch
00:53 - Why remove the Earthing conductor
01:28 - It's still LIVE
01:41 - Our tester
02:25 - The test
03:23 - The results
Videos are training aids for City and Guilds (C and G) and EAL courses Level 1, 2, 3 plus AM2, AM2S and AM2E.
You can follow me day by day on Facebook, Instagram, Twitter and TikTok lookout for "GSH Electrical”.
▶️ FACEBOOK facebook.com/gshelectrical
▶️ INSTAGRAM instagram.com/p/BrIhZmrAYGDTmjMdb9lUNQodMevqsbDDki3qpQ0
▶️ TWITTER mobile.twitter.com/gsh_electrical
▶️ TikTok vm.tiktok.com/ZMRBLFdhe
#GSHElectrical #Electricaltrainingvideos #electricaltesting #am2 #tncs