Uploaded November 2011 | Updated November 2026, 16 hours ago
In Part 7 we prepare the bottom of the box &the cedar panels for installation as well as the interior trim and frame for the lid.
In Part 7 we prepare the bottom of the box &the cedar panels for installation as well as the interior trim and frame for the lid.










