In the ITER Assembly Hall the first “sector sub-assembly” (the basic “building block" of the tokamak) is progressively taking shape. Of the 27 work packages required for final installation in the assembly pit, 8 had been achieved by late August. This 4D animation shows how the 1,200-tonne sub-assembly will be transferred from the sub-assembly tool to its final destination inside the assembly pit.
© Brigantium Engineering France for the ITER Organization
How ITER will install the first piece of the plasma chamberTwin giants to handle ITER componentsFusion Explained: A Lecture for Non SpecialistsMADE IN INDIAITER: THE MOST POWERFUL MAGNET IN THE WORLDThe ITER story2024 end-of-year greetings from the ITER projectITER Talks (10): The ITER Test Blanket Module ProgramITER NOW 1.1: The Way of the SunITER Talks (7): The ITER Research Plan, How to Reach Q=10Sneak preview: ITERs next big liftHeavy lifts, hidden efforts: behind the scenes of vacuum vessel installation
iterorganization |

How ITER will install the first "piece" of the plasma chamber

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER