Hello Everyone!
This week has been quite the challenge as paint doesn't come off of such a porous surface such as limestone easily. So i had quite the struggle getting it off. Some came willingly. Some not so much. Working so much on the front of the building also got me thinking about the colors that it would be finished in at the end of the restoration. SoIi made a little mock up to help visualize what it might look like when complete. Enjoy!
#abandoned #restoration #oldhouse
Hall and Brown/SESB Merch: teespring.com/stores/the-2nd-empire-strikes-back
Kim's Channel: youtube.com/channel/UCvyfozDsB8VVQyVs66Pu9ng
P.O. Box
The 2nd Empire Strikes Back
PO Box 2601
St Louis, MO 63116
Patreon: patreon.com/thesecondempirestrikesback
Instagram: instagram.com/the_2nd_empire_strikes_back
Tiktok: tiktok.com/@the2ndempirestrikesback
For Business Inquiries please email us at the2ndempirestrikesback@gmail.com
Campbell House: campbellhousemuseum.org
^^^Seriously if you visit St. Louis and love all things Victorian go here^^^
Music: bensound.com/royalty-free-music
Completed Projects (2021): New Roof, New Water Service, New Windows (Partial), Boiler Work, Sewer Lateral, Tuckpointing, Plaster Repair (Partial), Wood Floors (Partial), Electric Service (Partial)
Projects to Complete in 2022: Limestone Restoration of Front Elevation, Rebuild Mansard, New Windows (Partial), Complete Plaster Work (2nd Floor and Back Hallway 1st Floor, Kitchen and Dining Room), Plumbing Stacks and Rough in Plumbing, Complete Electric, HVAC (Basement and 1st Floor), High Velocity AC and Heat (2nd Floor), Mini Splits (3rd Floor), Framing on 3rd Floor, Rebuild of Front Cornice Work and Copper Gutter System, Rebuilding of Dormers
Projects to Complete in 2023: Hallways and Stairwells (Plaster Repair, Floors, Stringers of Stairwell Reinforment), Completion of Windows (1st and 3rd Floors), Parlors (Including Fireplace Mantels, and Pocket Doors, and Decorative Fretwork, Completion of 3 Floor Bathroom and Main Suite
Hello Everyone!
This week has been quite the challenge as paint doesn't come off of such a porous surface such as limestone easily. So i had quite the struggle getting it off. Some came willingly. Some not so much. Working so much on the front of the building also got me thinking about the colors that it would be finished in at the end of the restoration. SoIi made a little mock up to help visualize what it might look like when complete. Enjoy!
#abandoned #restoration #oldhouse
Hall and Brown/SESB Merch: teespring.com/stores/the-2nd-empire-strikes-back
Kim's Channel: youtube.com/channel/UCvyfozDsB8VVQyVs66Pu9ng
P.O. Box
The 2nd Empire Strikes Back
PO Box 2601
St Louis, MO 63116
Patreon: patreon.com/thesecondempirestrikesback
Instagram: instagram.com/the_2nd_empire_strikes_back
Tiktok: tiktok.com/@the2ndempirestrikesback
For Business Inquiries please email us at the2ndempirestrikesback@gmail.com
Campbell House: campbellhousemuseum.org
^^^Seriously if you visit St. Louis and love all things Victorian go here^^^
Music: bensound.com/royalty-free-music
Completed Projects (2021): New Roof, New Water Service, New Windows (Partial), Boiler Work, Sewer Lateral, Tuckpointing, Plaster Repair (Partial), Wood Floors (Partial), Electric Service (Partial)
Projects to Complete in 2022: Limestone Restoration of Front Elevation, Rebuild Mansard, New Windows (Partial), Complete Plaster Work (2nd Floor and Back Hallway 1st Floor, Kitchen and Dining Room), Plumbing Stacks and Rough in Plumbing, Complete Electric, HVAC (Basement and 1st Floor), High Velocity AC and Heat (2nd Floor), Mini Splits (3rd Floor), Framing on 3rd Floor, Rebuild of Front Cornice Work and Copper Gutter System, Rebuilding of Dormers
Projects to Complete in 2023: Hallways and Stairwells (Plaster Repair, Floors, Stringers of Stairwell Reinforment), Completion of Windows (1st and 3rd Floors), Parlors (Including Fireplace Mantels, and Pocket Doors, and Decorative Fretwork, Completion of 3 Floor Bathroom and Main Suite