Hitachi Rail connects Milan city centre to Linate airport by metro in just 12 minutes @HitachiRail
Hitachi Rail connects Milan city centre to Linate airport by metro in just 12 minutes  @HitachiRail
Uploaded July 2023 | Updated September 2026, 3 days ago
From 4 July 2023, Hitachi Rail will help connect the new M4 ‘Blue Line’ from San Babila station in Milan city centre to Linate airport, cutting journey times by two-thirds, from 33 to just 12 minutes. This major milestone for the Blue Line marks a significant shift in the transition from private to public transport across Milan, helping to cut carbon emissions, and air and noise pollution.

Upon completion in the second half of 2024, the Blue Line will connect the east and west of the city, linking 21 stations in just 30 minutes. The Blue Line is being delivered by the M4 consortium, in which Hitachi Rail is a shareholder, and for which it is delivering modern driverless trains, the signalling system, telecommunication technologies and digital pricing and access control systems.

The Blue Line will deliver a significant boost for public transport, providing a train every 180 seconds during peak hours, with a maximum speed of 80 km/h and, a capacity of up to 500 passengers per vehicle. The train will carry an estimated 24,000 people per hour per train direction. The new service will deliver a significant modal shift helping to cut 4.43 million car journeys annually. This will result in an annual reduction of 10,310 tonnes of CO2 and 1,511/kg of harmful particulate matter (PM10) in the air.

Hitachi Rail will deliver 47 autonomous trains for the Blue Line. The state-of-the-art trains will draw on Hitachi Rail’s autonomous technology already employed in the likes of Milan, Copenhagen, Riyadh and Honolulu. The trains will be equipped with a real-time video system connected to the PCO (Central Operations Centre), where all the automatic operational activities are carried out to manage the flow of trains and control the entire system. They have wide accessibility, and spaces designed specifically for the connection to and from Linate airport.

Hitachi Rail also supplied the ATC signalling system, based on CBTC driverless technology, which will help to deliver a reliable and safe service. The technology enables a high degree of flexibility, allowing the number of trains on the line to easily vary, responding to passenger needs.
Hitachi Rail connects Milan city centre to Linate airport by metro in just 12 minutesBehind the Scenes: Hitachi Rail Europe building a new train factory for the UKHitachi Rail Europe Summer Party 2016So sichert Hitachi Rail sein Know-how für die Zukunft | SkillShare+Welcome to Hitachi Rail x InnoTrans 2024 - Day 4Meet Team Hitachi in Italy | Hitachi RailIntroducing the New Sustainable Lumo Fleet | Hitachi RailWorking at Hitachi Rail - Start Your JourneyMeet Team Hitachi in India | Hitachi RailOur Digital Value Engine I Hitachi RailA Career at Hitachi Rail Starts With a Single Stride...Preview of the Hitachi Class 385 Train for Scotland
Hitachi Rail |

Hitachi Rail connects Milan city centre to Linate airport by metro in just 12 minutes

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER