Uploaded October 2026 | Updated November 2026, 2 hours ago
On large scale infrastructure projects, like Rail Baltica, stumps are traditionally dug out with excavators. They are then transported a few kilometers away, dried, cleaned and chipped.
Even after all that, stump chips contaminated with sand are difficult to sell, because sand can melt into glass inside boiler houses and damage equipment.
It also creates a logistics headache: piles of stumps that need to be loaded, hauled away from the site, and disposed of elsewhere. In Estonia, disposal also includes transport and landfill fees; the latter can cost around 40€ per ton of stump material (as of 2025).
Because every load of stumps you haul off-site is money straight out of the project budget, it makes sense to drill them into pieces on site.
👉 See the full project story:
bit.ly/dipperfox-rail-baltica
🔶 Learn about us: dipperfox.com
🔶 See all of our products: dipperfox.com/products
On large scale infrastructure projects, like Rail Baltica, stumps are traditionally dug out with excavators. They are then transported a few kilometers away, dried, cleaned and chipped.
Even after all that, stump chips contaminated with sand are difficult to sell, because sand can melt into glass inside boiler houses and damage equipment.
It also creates a logistics headache: piles of stumps that need to be loaded, hauled away from the site, and disposed of elsewhere. In Estonia, disposal also includes transport and landfill fees; the latter can cost around 40€ per ton of stump material (as of 2025).
Because every load of stumps you haul off-site is money straight out of the project budget, it makes sense to drill them into pieces on site.
👉 See the full project story:
bit.ly/dipperfox-rail-baltica
🔶 Learn about us: dipperfox.com
🔶 See all of our products: dipperfox.com/products










