Great Lakes Central Railroad @trainroomgary
Great Lakes Central Railroad  @trainroomgary
Uploaded November 2021 | Updated September 2026, 2 hours ago
In this video we will be at Durand Station, Durand Michigan checking a locomotive at the diamond crossover. All aboard for a rail-fanning adventure with Train Room Gary.

❤ Thank you for watching my video!

If you enjoyed this video, please hit the like button & leave some comments.

Also, don't forget to subscribe to my channel and click the “bell” icon to be the first to know about my latest video releases!

▶︎ Great Lakes Central Railroad is the largest regional railroad in the great state of Michigan, with 400 miles of track stretching through Central and Northern Michigan.

▶︎ Great Lakes Central - 600 Oakwood Ave. - Owosso, MI 48867

▶︎ Hi • Train Room Gary from The Detroit & Mackinac Railway.
If this video helps you out, remember to hit me up with a “Like” and “Subscribe”.

▶︎ Production
Editing Software: Final Cut Pro X Version 10.5.4 on an iMacOS Big Sur 11.6
Artwork & Titles: Adobe Photoshop
Cameras: iPhone 11 Pro • Canon T6i • GoPro Max

▶︎ Train Room Gary • Production / Detroit, Michigan USA

▶︎ e- mail accepted at: trainroom@gmail.com

▶︎ Some of the narration by: Train Room Pam

▶︎ This video is for ages 14 & up.

▶︎ The Layout - Brief Specs
This layout is a shelf layout - 24 feet long with about 10 foot turnarounds on each end.
4 Mail Lines with 7 sidings,
Track: Tubular Track by K-Line Shadow Rail on a cork road bed. (No longer in production)
Lionel and K-line 0 Gauge Switches
Main Transformer: Lionel ZW-L with 4 180W Powerhouse Bricks
Second Transformer: Lionel CW 80
Control Systems: Lionel Cab 1 • Lionel Universal Remote • LionChief Plus Remotes
• Lionel’s Bluetooth APP • LVC Lionel Voice Control
• MTH DCS & Wi-Fi

▶︎ A little story about me: I am a retired shop teacher, I spent 36 years teaching Graphic Arts, Vocational Printing Trades, Photography along with extra duties like  Drivers Education, & Yearbook Advisor.
I started teaching shop in the fall of 1974. We had seven full time shop teachers. (Industrial Education)
Auto Shop
Construction • Built A House
Drafting, Mechanical & Architectural 
Graphic Arts
Small Engines • Marine & Lawn
Metal Shop
Wood Shop
In the late 90’s Industrial Education had to deal with new state guidelines called: Core Curriculum. This put a strong emphasis on the college prep program for all Michigan Students.  Needless to say the students had no room in the school day for elective classes and this put Industrial Education out of business
I also took shop classes in High School. Mr. Pasternak and Mr. Mathers were my high school shop teachers and they got me started at Central Michigan University to become a Michigan Shop Teacher.
I would not want to be a high school student today. No shop classes.

▶︎ Train Room Gary is a Supporting Member on the: OGR Forum @ ogrforum.ogaugerr.com

----------------------------------------------------------------
trainroomgary - All Rights Reserved 2011 - 2020
----------------------------------------------------------------

▶︎ Music in this video from: YouTube Audio Library

You're free to use these songs and monetize your video.
United States of America • Copyright Fair Use Act • Copyright Infringement NOT intended. For entertainment purposes only on YouTube
Great Lakes Central RailroadShopping for Model Train Stuff at MENARDS! • It’s time to play! What’s in the box?NMRA • 40 Home Layout Tours   #5 of 8Mail Call The Shade Tree Fix-it Man • Wisconsin CentralAI Photography for Model RailroadersLionel • Rail King Operating Session 1-ALionel’s Detroit Edison SW8 & The Old Road Dinner Train 🚂A Power Tool for all Model Railroaders • Product ReviewMENARDS LED Lights for your Train RoomRunCam 6 • for model railroaders! • Video Action Cameratrainroomgary Live StreamLionel Spinning Propeller Locomotive
trainroomgary |

Great Lakes Central Railroad

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER