Uploaded September 2015 | Updated November 2026, 2 days ago
What a view! High above Bridge River, crews are putting the finishing touches on a new 17.5-metre-long, two-lane bridge to replace a deteriorating retaining wall on Road 40. The road is a crucial link between Lillooet and Gold Bridge, frequented by locals, tourists, commercial truck drivers and those from the forest and energy industries. Ministry staff shot this aerial footage of the work in August 2015. The new bridge is expected to be open at the end of September 2015.
What a view! High above Bridge River, crews are putting the finishing touches on a new 17.5-metre-long, two-lane bridge to replace a deteriorating retaining wall on Road 40. The road is a crucial link between Lillooet and Gold Bridge, frequented by locals, tourists, commercial truck drivers and those from the forest and energy industries. Ministry staff shot this aerial footage of the work in August 2015. The new bridge is expected to be open at the end of September 2015.










