Uploaded September 2026 | Updated November 2026, 1 day ago
The Gordie Howe International Bridge is a cable-stayed bridge across the Detroit River connecting Detroit, Michigan, United States with Windsor, Ontario, Canada by linking Interstate 75 in Michigan with Highway 401 in Ontario. The bridge, owned equally by Canada and the state of Michigan, provides uninterrupted freeway traffic flow, as opposed to the configuration with the nearby Ambassador Bridge that connects to city streets on the Ontario side. The bridge is named after Canadian ice hockey player Gordie Howe, whose celebrated career included 25 years with the Detroit Red Wings, and who died two years before construction began.
First proposed in the early 2000s, the project was met with prominent opposition by Ambassador Bridge owner Manuel "Matty" Moroun, who believed competition from a publicly owned bridge would reduce his revenue. A Canadian federal Crown corporation, the Windsor–Detroit Bridge Authority, was established in 2012 to coordinate the bridge's construction and management. The "Bridging North America" consortium was selected in July 2018 to design, build, operate and maintain the bridge, and construction began that month. The CA$3.8 billion cost of construction was funded by the Canadian federal government and will be paid for by bridge tolls. Construction of the bridge was completed in June 2026, inaugurated on July 24, 2026, and opened to traffic on July 27, 2026.
The Gordie Howe International Bridge is a cable-stayed bridge across the Detroit River connecting Detroit, Michigan, United States with Windsor, Ontario, Canada by linking Interstate 75 in Michigan with Highway 401 in Ontario. The bridge, owned equally by Canada and the state of Michigan, provides uninterrupted freeway traffic flow, as opposed to the configuration with the nearby Ambassador Bridge that connects to city streets on the Ontario side. The bridge is named after Canadian ice hockey player Gordie Howe, whose celebrated career included 25 years with the Detroit Red Wings, and who died two years before construction began.
First proposed in the early 2000s, the project was met with prominent opposition by Ambassador Bridge owner Manuel "Matty" Moroun, who believed competition from a publicly owned bridge would reduce his revenue. A Canadian federal Crown corporation, the Windsor–Detroit Bridge Authority, was established in 2012 to coordinate the bridge's construction and management. The "Bridging North America" consortium was selected in July 2018 to design, build, operate and maintain the bridge, and construction began that month. The CA$3.8 billion cost of construction was funded by the Canadian federal government and will be paid for by bridge tolls. Construction of the bridge was completed in June 2026, inaugurated on July 24, 2026, and opened to traffic on July 27, 2026.
![⁴ᴷ Patroon Island Bridge (Interstate 90) eastbound [4K VIDEO]
The Patroon Island Bridge is a multi-span deck truss bridge that spans the Hudson River in Albany and Rensselaer in the state of New York. A major crossing, it carries Interstate 90 in the east–west direction between Albany and Rensselaer Counties. It has been in service since 1968, with structural repairs made in 1992, and a comprehensive renovation/retrofit completed in 2016.
The bridges name comes from the former Lower Patroon Island that once existed adjacent to the bridge, the channel of which dividing it from the western mainland was infilled for the construction of the bridge. ⁴ᴷ Patroon Island Bridge (Interstate 90) eastbound [4K VIDEO]](https://i.ytimg.com/vi/zhWRrxqJR-E/mqdefault.jpg)