Uploaded September 2026 | Updated November 2026, 4 days ago
The Gordie Howe International Bridge is a cable-stayed bridge across the Detroit River connecting Detroit, Michigan, United States with Windsor, Ontario, Canada by linking Interstate 75 in Michigan with Highway 401 in Ontario. The bridge, owned equally by Canada and the state of Michigan, provides uninterrupted freeway traffic flow, as opposed to the configuration with the nearby Ambassador Bridge that connects to city streets on the Ontario side. The bridge is named after Canadian ice hockey player Gordie Howe, whose celebrated career included 25 years with the Detroit Red Wings, and who died two years before construction began.
First proposed in the early 2000s, the project was met with prominent opposition by Ambassador Bridge owner Manuel "Matty" Moroun, who believed competition from a publicly owned bridge would reduce his revenue. A Canadian federal Crown corporation, the Windsor–Detroit Bridge Authority, was established in 2012 to coordinate the bridge's construction and management. The "Bridging North America" consortium was selected in July 2018 to design, build, operate and maintain the bridge, and construction began that month. The CA$3.8 billion cost of construction was funded by the Canadian federal government and will be paid for by bridge tolls. Construction of the bridge was completed in June 2026, inaugurated on July 24, 2026, and opened to traffic on July 27, 2026.
The Gordie Howe International Bridge is a cable-stayed bridge across the Detroit River connecting Detroit, Michigan, United States with Windsor, Ontario, Canada by linking Interstate 75 in Michigan with Highway 401 in Ontario. The bridge, owned equally by Canada and the state of Michigan, provides uninterrupted freeway traffic flow, as opposed to the configuration with the nearby Ambassador Bridge that connects to city streets on the Ontario side. The bridge is named after Canadian ice hockey player Gordie Howe, whose celebrated career included 25 years with the Detroit Red Wings, and who died two years before construction began.
First proposed in the early 2000s, the project was met with prominent opposition by Ambassador Bridge owner Manuel "Matty" Moroun, who believed competition from a publicly owned bridge would reduce his revenue. A Canadian federal Crown corporation, the Windsor–Detroit Bridge Authority, was established in 2012 to coordinate the bridge's construction and management. The "Bridging North America" consortium was selected in July 2018 to design, build, operate and maintain the bridge, and construction began that month. The CA$3.8 billion cost of construction was funded by the Canadian federal government and will be paid for by bridge tolls. Construction of the bridge was completed in June 2026, inaugurated on July 24, 2026, and opened to traffic on July 27, 2026.
![⁴ᴷ 12th Street Viaduct (Lower Level) westbound [4K VIDEO]
Built in 1914, the 12th Street Viaduct is a dual-level reinforced concrete bridge spanning the railyards of Kansas Citys West Bottoms area and connecting the industrial areas of West Kansas City with the city center. ⁴ᴷ 12th Street Viaduct (Lower Level) westbound [4K VIDEO]](https://i.ytimg.com/vi/QWKGjTosnVQ/mqdefault.jpg)

![⁴ᴷ Interstate 99 (Northern Segment) southbound [4K VIDEO]
⁴ᴷ Interstate 99 (Northern Segment) southbound [4K VIDEO] ⁴ᴷ Interstate 99 (Northern Segment) southbound [4K VIDEO]](https://i.ytimg.com/vi/Qg-mSBP3dyw/mqdefault.jpg)
![⁴ᴷ St. Charles Bypass (MO 370) eastbound [4K VIDEO]
In eastern Missouri, Route 370 is an interstate-standard freeway running east-west through the far western suburbs of the St. Louis metro area as an alternate to the nearby I-70 freeway and a bypass of the St. Charles area. ⁴ᴷ St. Charles Bypass (MO 370) eastbound [4K VIDEO]](https://i.ytimg.com/vi/QqLqjTVLlKQ/mqdefault.jpg)
![⁴ᴷ St. Louis Bypass (Interstate 255) southbound [4K VIDEO]
Interstate 255 forms an eastern bypass of greater St. Louis for long-distance traffic along the I-55 corridor between Missouri and Illinois. ⁴ᴷ St. Louis Bypass (Interstate 255) southbound [4K VIDEO]](https://i.ytimg.com/vi/QtrnBjTD0rc/mqdefault.jpg)
![⁴ᴷ Twin Cities Beltway (Interstates 494 & 694) counterclockwise/outer loop [4K VIDEO]
⁴ᴷ Twin Cities Beltway (Interstates 494 & 694) counterclockwise/outer loop [4K VIDEO] ⁴ᴷ Twin Cities Beltway (Interstates 494 & 694) counterclockwise/outer loop [4K VIDEO]](https://i.ytimg.com/vi/R13IPJc8caw/mqdefault.jpg)
![⁴ᴷ Gordie Howe International Bridge westbound [4K VIDEO]
The Gordie Howe International Bridge is a cable-stayed bridge across the Detroit River connecting Detroit, Michigan, United States with Windsor, Ontario, Canada by linking Interstate 75 in Michigan with Highway 401 in Ontario. The bridge, owned equally by Canada and the state of Michigan, provides uninterrupted freeway traffic flow, as opposed to the configuration with the nearby Ambassador Bridge that connects to city streets on the Ontario side. The bridge is named after Canadian ice hockey player Gordie Howe, whose celebrated career included 25 years with the Detroit Red Wings, and who died two years before construction began.
First proposed in the early 2000s, the project was met with prominent opposition by Ambassador Bridge owner Manuel Matty Moroun, who believed competition from a publicly owned bridge would reduce his revenue. A Canadian federal Crown corporation, the Windsor–Detroit Bridge Authority, was established in 2012 to coordinate the bridges construction and management. The Bridging North America consortium was selected in July 2018 to design, build, operate and maintain the bridge, and construction began that month. The CA$3.8 billion cost of construction was funded by the Canadian federal government and will be paid for by bridge tolls. Construction of the bridge was completed in June 2026, inaugurated on July 24, 2026, and opened to traffic on July 27, 2026. ⁴ᴷ Gordie Howe International Bridge westbound [4K VIDEO]](https://i.ytimg.com/vi/Ra3AUFpyKbs/mqdefault.jpg)

![⁴ᴷ Interstate 890 eastbound (from NYS Thruway) [4K VIDEO]
In New Yorks Capital District region, Interstate 890 is a short loop freeway that connects the New York State Thruway with the city of Schenectady and the large-scale GE Plant.
Highlights: JCT NY 890, GE Plant, Downtown Schenectady, JCT NY 7, END I-890; JCT I-90 ⁴ᴷ Interstate 890 eastbound (from NYS Thruway) [4K VIDEO]](https://i.ytimg.com/vi/S1jhVtZ-0vI/mqdefault.jpg)
![⁴ᴷ Dodge Road Freeway (US 6) westbound [4K VIDEO]
The Dodge Street Freeway (US 6) runs east-west across the west suburbs of Omaha, NE as a second alternate freeway corridor to the busier I-80 freeway further south. ⁴ᴷ Dodge Road Freeway (US 6) westbound [4K VIDEO]](https://i.ytimg.com/vi/SGoWz1ILRxs/mqdefault.jpg)
![⁴ᴷ Interstate 890 westbound (to NYS Thruway) [4K VIDEO]
In New Yorks Capital District region, Interstate 890 is a short loop freeway that connects the New York State Thruway with the city of Schenectady and the large-scale GE Plant.
Highlights: JCT NY 7, Downtown Schenectady, GE Plant, END I-890; JCT I-90; JCT NY 890 ⁴ᴷ Interstate 890 westbound (to NYS Thruway) [4K VIDEO]](https://i.ytimg.com/vi/SQmG1ZihAvM/mqdefault.jpg)