Glue-up Station Assembly, Part 3 @Woodtoolsworkshop
Glue-up Station Assembly, Part 3  @Woodtoolsworkshop
Uploaded May 2016 | Updated November 2026, 3 hours ago
Building a glue-up station--part 3 in a series: attach the clamp head support to the platform; mount and hang the platform; assemble and attach the vertical rails; build the adjustable clamp bar.

This project appeared in Shop Notes magazine #62, March 2002, which means I cannot post the pattern. However, they posted a PDF of the cutting diagram as an online "Shop Notes Extra", which can be downloaded here:
shopnotes.com/files/issues/062/clamping-station.pdf

The glue-up station project requires some hardware which is not listed in the cutting diagram. You will need:
6 Bronze bushings 5/8" ID, 3/4" OD, 1" long
24 Hex nuts 5/8"
18 Flat washers 5/8"
6 Acorn nuts 5/8"
3 Quick release pins 1/4" x 3 1/2"
6 All-thread steel rods 5/8" x 15"
Numerous screws of varying types and sizes

And here are more places to find Wood Tools Workshop:
WoodToolsWorkshop.com
wtwshop.com/Instagram
plus.google.com/+woodtoolsworkshop
wtwshop.com/Twitter
wtwshop.com/Facebook
Glue-up Station Assembly, Part 3Support Arm and Rail! Metal Cutting Station, Part 2Making my Jointer MobileItty Bitty Dowel Jig for Band SawSolar-Powered Motion Detector LightBuild This Drill Press Angle JigDrill Press Repair: Tension LeverStorage Shed Overhead ShelfThreaded Inserts; Simple JigVariations on the Heart-Shaped BoxRocking Toy Airplane for Makers CareStorage Case for Soldering Iron
Wood Tools Workshop |

Glue-up Station Assembly, Part 3

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER