Uploaded March 2016 | Updated November 2026, 3 hours ago
Used to pump water to the huge brine wells on the banks of the River Wyre. There's four of these giant pumps within a half mile radius of each other, More video's of the other locations to come
Here's the history -
At Preesall, on the east bank of the River Wyre, a large area of land was given over to the mining of brine deposits. In 1889, the brine was sent in pipes across the river to the salt works at Burn Naze on the west bank.
The brine mining was carried out by the Fleetwood Salt Co. Ltd, who leased 445 hectares at Preesall, obtained permission for the pipes across the river and leased a further 9 hectares of Burn Naze salt marsh for the works (see separate entry) .
Before brine pumping came along, salt production by the evaporation of seawater had been a feature of the area around the mouth of the Wyre. Production of salt using this method was carried out in the 16th and 17th centuries. However, local methods moved on — to brine pumping, rock salt mining and then to the solution mining of modern times.
Early brine mining commenced with a 170m deep borehole sunk at Fleetwood by the Royal Engineers in 1860. At Preesall, the Rev. Daniels and Daniel Elletson sank a 2.5m diameter half-brick lined shaft in 1875. Other shafts followed in the 1870s.
Fleetwood Salt Company's 1885 borehole was 186m deep and dug under the direction of E. Fiddler and A. Anderson. They pumped the brine to the surface using a 'Bull' engine. In 1889, the company gained a monopoly on the deposits and proceeded to carry out the scheme already described.
A small reservoir was constructed on a hill as part of the preparations for pumping brine to Burn Naze. The pipe across the river was 250mm in diameter, designed by Charles H. Beloe and laid by T. Riley. Pumping commenced in 1890 at a rate of 13,640 litres per hour. The rate soon fell to 3,410 litres, which was insufficient for the salt works, so a method of pumping from one shaft to another and extracting the collected volume was devised.
The first white salt was produced at Burn Naze on the 25th February 1890. The company was then sold to United Alkali Co. Ltd. In 1891, Stanley Bros. of Nuneaton built some 460m of 1.7m diameter tunnel at Preesall using a Stanley Heading Machine. That same year, more land at Burn Naze was purchased for the making of carbonate of soda and the Wyre pipeline was replaced with 183m of 100mm rubber hose (later replaced by wire armoured hose).
In 1892-3, boreholes were sunk at the ends of the tunnels and lined with perforated steel pipes. Two 122m wells were dug by Charles Chapman & Sons, and a pumping installation by Hathorn Davey & Co. — capable of raising 204,500 litres per hour — was installed. In 1897, North Field pumping station was built to use the forcing system.
Around 1902, Preesall Salt Works was built to the north of the salt marshes on the east bank of the river. A branch line to the Garstang & Knott End Railway was laid in 1912. An ammonia soda works started production in 1924, later becoming part of the ICI Hillhouse Works.
Brine extraction at Stalmine
In 1872, while searching for iron ore, a syndicate of men from Barrow struck a bed of rock salt about 400ft beneath the surface in Preesall. During the 20th century salt in the form of brine was used as a chemical feedstock by ICI Chemicals and Polymers at the Hillhouse site, Thornton for the production of chlorine, caustic soda and soda ash. Most of the more recent brine wells were drilled in Stalmine. Water was pumped down the brine well which dissolved the Halite (salt) bed and the salt extracted in the form of brine (solution mining). The last brine well to be drilled was BW 135 at the Heads, Stalmine in November 1991.
Used to pump water to the huge brine wells on the banks of the River Wyre. There's four of these giant pumps within a half mile radius of each other, More video's of the other locations to come
Here's the history -
At Preesall, on the east bank of the River Wyre, a large area of land was given over to the mining of brine deposits. In 1889, the brine was sent in pipes across the river to the salt works at Burn Naze on the west bank.
The brine mining was carried out by the Fleetwood Salt Co. Ltd, who leased 445 hectares at Preesall, obtained permission for the pipes across the river and leased a further 9 hectares of Burn Naze salt marsh for the works (see separate entry) .
Before brine pumping came along, salt production by the evaporation of seawater had been a feature of the area around the mouth of the Wyre. Production of salt using this method was carried out in the 16th and 17th centuries. However, local methods moved on — to brine pumping, rock salt mining and then to the solution mining of modern times.
Early brine mining commenced with a 170m deep borehole sunk at Fleetwood by the Royal Engineers in 1860. At Preesall, the Rev. Daniels and Daniel Elletson sank a 2.5m diameter half-brick lined shaft in 1875. Other shafts followed in the 1870s.
Fleetwood Salt Company's 1885 borehole was 186m deep and dug under the direction of E. Fiddler and A. Anderson. They pumped the brine to the surface using a 'Bull' engine. In 1889, the company gained a monopoly on the deposits and proceeded to carry out the scheme already described.
A small reservoir was constructed on a hill as part of the preparations for pumping brine to Burn Naze. The pipe across the river was 250mm in diameter, designed by Charles H. Beloe and laid by T. Riley. Pumping commenced in 1890 at a rate of 13,640 litres per hour. The rate soon fell to 3,410 litres, which was insufficient for the salt works, so a method of pumping from one shaft to another and extracting the collected volume was devised.
The first white salt was produced at Burn Naze on the 25th February 1890. The company was then sold to United Alkali Co. Ltd. In 1891, Stanley Bros. of Nuneaton built some 460m of 1.7m diameter tunnel at Preesall using a Stanley Heading Machine. That same year, more land at Burn Naze was purchased for the making of carbonate of soda and the Wyre pipeline was replaced with 183m of 100mm rubber hose (later replaced by wire armoured hose).
In 1892-3, boreholes were sunk at the ends of the tunnels and lined with perforated steel pipes. Two 122m wells were dug by Charles Chapman & Sons, and a pumping installation by Hathorn Davey & Co. — capable of raising 204,500 litres per hour — was installed. In 1897, North Field pumping station was built to use the forcing system.
Around 1902, Preesall Salt Works was built to the north of the salt marshes on the east bank of the river. A branch line to the Garstang & Knott End Railway was laid in 1912. An ammonia soda works started production in 1924, later becoming part of the ICI Hillhouse Works.
Brine extraction at Stalmine
In 1872, while searching for iron ore, a syndicate of men from Barrow struck a bed of rock salt about 400ft beneath the surface in Preesall. During the 20th century salt in the form of brine was used as a chemical feedstock by ICI Chemicals and Polymers at the Hillhouse site, Thornton for the production of chlorine, caustic soda and soda ash. Most of the more recent brine wells were drilled in Stalmine. Water was pumped down the brine well which dissolved the Halite (salt) bed and the salt extracted in the form of brine (solution mining). The last brine well to be drilled was BW 135 at the Heads, Stalmine in November 1991.


![Afterburner and Vertical Climb out - New Primer ZK425 Eurofighter Typhoon 28/4/2017
Very exciting day at Warton yesterday, Primer Hawk test flight, A Saudi Tonka doing ground engine runs, The usual T&Gs by the RAF and this rather dramatic lift-off by new Typhoon ZK425.
The Eurofighter Typhoon is a twin-engine, canard-delta wing, multirole fighter.[7][8] The Typhoon was designed and is manufactured by a consortium of Alenia Aermacchi (Leonardo since 2017), Airbus Group, and BAE Systems that conducts the majority of the project through a joint holding company, Eurofighter Jagdflugzeug GmbH formed in 1986. NATO Eurofighter and Tornado Management Agency manages the project and is the prime customer.[9]
The aircrafts development effectively began in 1983 with the Future European Fighter Aircraft programme, a multinational collaboration among the UK, Germany, France, Italy, and Spain. Disagreements over design authority and operational requirements led France to leave the consortium to develop the Dassault Rafale independently. A technology demonstration aircraft, the British Aerospace EAP, first took flight on 6 August 1986; the first prototype of the finalised Eurofighter made its first flight on 27 March 1994. The aircrafts name, Typhoon, was adopted in September 1998; the first production contracts were also signed that year. Afterburner and Vertical Climb out - New Primer ZK425 Eurofighter Typhoon 28/4/2017](https://i.ytimg.com/vi/EPvqQXjk05M/mqdefault.jpg)



![New Improved Edit-Flying high over Blackpool New RAF Airbus A400M Atlas ZM403 Today 18/8/16
A rare visitor over Blackpool Skies today, Royal Air Force Airbus A400M Atlas, Flew several circuits over the Airport, Making some really long turns. Probably a training flight. This particular aircraft is new and has only been in service since July last year. Flown by 24 Squadron based at Brize Norton, Oxfordshire, United Kingdom...
The Airbus A400M Atlas is a multi-national, four-engine turboprop military transport aircraft. It was designed by Airbus Military (now Airbus Defence and Space) as a tactical airlifter with strategic capabilities to replace older transport aircraft, such as the Transall C-160 and the Lockheed C-130 Hercules.[5] The A400M is positioned, in terms of size, between the C-130 and the C-17; it can carry heavier loads than the C-130, while able to use rough landing strips. Along with the transport role, the A400M can perform aerial refuelling and medical evacuation when fitted with appropriate equipment.
The A400Ms maiden flight, originally planned for 2008, took place on 11 December 2009 from Seville, Spain. Between 2009 and 2010, the A400M faced cancellation as a result of development program delays and cost overruns; however, the customer nations chose to maintain their support of the project. A total of 174 A400M aircraft have been ordered by eight nations as of July 2011. In March 2013, the A400M received European Aviation Safety Agency (EASA) certification. The first aircraft was delivered to the French Air Force in August 2013. New Improved Edit-Flying high over Blackpool New RAF Airbus A400M Atlas ZM403 Today 18/8/16](https://i.ytimg.com/vi/FTf20uIOGgI/mqdefault.jpg)