FP McCann Off-Site Building Solutions used at Shoreditch, London. @FPMcCann1
FP McCann Off-Site Building Solutions used at Shoreditch, London.  @FPMcCann1
Uploaded March 2021 | Updated November 2026, 3 hours ago
FP McCann’s structural precast concrete building and architectural façades division has supplied the complete package of architectural precast cladding components on a brand new office and retail development in Shoreditch High Street, London. Covering an area of 35,819 sq ft, the new building comprises 5 floors of offices spanning a ground floor and basement containing retail outlets including a restaurant/cafe.
Undertaking the construction on behalf of client Max Barney Development Ltd, main building contractor Montway has recently completed the 525 day project designed by 21st Architecture, with the original design drawn as handset brickwork.
Working with an in-situ concrete frame, FP McCann was sent the design brief for the architectural façade panels, consisting of both grey brick and acid-etched finished concrete.
In total, 249 individual units were supplied from FP McCann’s Littleport factory over a 10 week period and installed using a single tower crane, eliminating the use of any scaffolding on the building. Over 33,000 individual handmade bricks each measuring 528mm long x 40mm high were cast on at the factory, making 221 cladding panels totalling 623m² and pointed with mortar; colour as specified by the architect. The 28 acid etched panels (243m²) for the side of the building facing the car park were colour matched to the brick façade.
Additionally, FP McCann supplied the corner and ‘L’ shaped precast brick-faced concrete columns consisting of 130m³ of concrete. To allow for fixing of the cladding panels which were secured floor by floor, FP McCann designed and supplied bespoke brackets.
The architectural façade team at FP McCann worked closely with the engineers and architects on the project to ensure all aspects of the build met the exacting client specification.
Commenting on the completed project, Anthony Kelly - Project Manager for Montway says, “This method of architectural precast concrete/brick-faced construction demonstrates a number of efficiencies compared with practices associated with a traditional build. The off-site manufacturing of the building components offers significant advantages in terms of product quality and integrity. On site, speed of construction, minimising waste and the ability to work uninterrupted in all weather conditions are all major benefits. Additionally, the external façade system removes the need for scaffolding and wet trades, thereby minimising the health and safety risk factors associated with people working at height.”

Find out more about this project here: fpmccann.co.uk/portfolio-items/prestigious-shoreditch-development-specifies-fp-mccanns-architectural-cladding-panels

Visit our website: fpmccann.co.uk or get in touch by emailing sales@fpmccann.co.uk.
You can also keep up to date with our latest news by following us social media:
Facebook: facebook.com/FP-McCann-110181082374851
LinkedIn: linkedin.com/company/fp-mccann
Twitter: twitter.com/FPMcCann
Instagram: instagram.com/fpmccann
FP McCann Off-Site Building Solutions used at Shoreditch, London.Whitehaven HospitalInstallation Series - EasibaseAn introduction to the UKs largest precast manufacturer - FP McCann.FP McCann Multi-Load Solution | Smarter Deliveries for Merchants | Plastic Pipe Range Coming SoonUrban Pipejacking Microtunnelling AnimationModern Methods of Construction with FP McCann using Precast ConcreteFP McCann - Matlock StormStore™ Tank InstallationConcrete Pipe LifterFP McCanns ‘Modern Methods of Construction’  on Hollybrooks Dagenham Development Transport HouseFP McCanns Expansion of Victoria Terminal 1, Belfast HarbourFP McCann Loughside Quarry Blast August 2014
FP McCann |

FP McCann Off-Site Building Solutions used at Shoreditch, London.

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER