Uploaded April 2012 | Updated September 2026, 3 days ago
Fox Blocks boom pump pour day with installing subcontractor and General Contractor testimonials in San Diego area CA. Installer achieves .06 man hours sq ft. 2200 sq ft of wall formed and poured 4 days 120 man hours.
Fox Blocks boom pump pour day with installing subcontractor and General Contractor testimonials in San Diego area CA. Installer achieves .06 man hours sq ft. 2200 sq ft of wall formed and poured 4 days 120 man hours.










