Footscray Road Concrete Column Installation (Full Version) @WestGateTunnelProject
Footscray Road Concrete Column Installation (Full Version)  @WestGateTunnelProject
Uploaded June 2020 | Updated September 2026, 25 minutes ago
Take a look at the full length unedited footage of recent works on the West Gate Tunnel Project.

We're building a new elevated road along Footscray Road. Before assembling and installing the launching gantry crane to create the road, the big machine needs structural support given by these concrete columns.

Learn more about this area of the project: https://westgatetunnelproject.vic.gov.au/construction/port-to-city
Footscray Road Concrete Column Installation (Full Version)Inside the TBM Bella with BenLoFi Beats | West Gate Tunnel Project | Federation Trail 🚁🛣️West Gate Tunnel - a vital alternative - TV adDrone shots of our northern portal and tunnelling hub sitesMillers Road Beam Lift (Full Version)Newport Rail Bridge Widening & Concrete Pour at Princes Freeway Entry Ramp (Full Version)Grieve Parade Bridge Beam Installation (Full Version)Heavy Vehicle Tolls on the West Gate Tunnel ProjectWest Gate Tunnel Project Summer Works 2022 - Plan your journeySouthern Outbound Exit Tunnel Cladding Is CompleteWeve demolished old buildings at the former Melbourne Market site
West Gate Tunnel Project |

Footscray Road Concrete Column Installation (Full Version)

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER