Fitting industrial unit first floor using traditional joisting method**WORKING WITH A COLD🤧** PART 2  @thetallcarpenter
Fitting industrial unit first floor using traditional joisting method**WORKING WITH A COLD🤧** PART 2  @thetallcarpenter
The Tall Carpenter | Fitting industrial unit first floor using traditional joisting method**WORKING WITH A COLD🤧** PART 2 @thetallcarpenter | Uploaded December 2023 | Updated October 2024, 1 day ago.
In this video we finish fitting the hangers and joists and lay down the chipboard flooring.
Fitting industrial unit first floor using traditional joisting method**WORKING WITH A COLD🤧** PART 2Being a solo carpenter in your 50s can be tiring!!Kitchen Fitting in the 12 Hip House***IT ALL GOT A BIT HECTIC***Fitting a latch and handles on a door with narrow stiles ***FIRST TIME EVER***Fitting rafters to a structural steel frame.  PART 6   ***knocking off early***DeWALT DCN660 nail gun. ***6 MONTH REVIEW***Old-school joinery in simple curved top porch roof***BEFORE BEING DESTROYED***Fitting timber rafters to a structural steel framed roof. PART 2Lean to type extension roof ***IN TIME LAPSE***Laminate floor setting out and fitting tips with a Pro Carpenter***COMPLETE HOUSE 2ND FIX PART6***Plasterboard/Drywall ceiling fixing tip ***PLUS BONUS TIP***Carpentry and working in the rain ***WHAT DO YOU DO***

Fitting industrial unit first floor using traditional joisting method**WORKING WITH A COLD🤧** PART 2 @thetallcarpenter

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER