First Time Digging Holes in Over Two Years for a New Horse Barn @RRBuildings
First Time Digging Holes in Over Two Years for a New Horse Barn  @RRBuildings
Uploaded August 2026 | Updated September 2026, 2 weeks ago
Save $40 NOW for LABOR DAY
Check out the RR Buildings Tool belt
bit.ly/4sGwX6c

It's been over two years since we have dug holes to pour concrete piers for a building. We will be putting up a horse barn for our next client, and it has been roughly ten years since we've built one of those!
First Time Digging Holes in Over Two Years for a New Horse BarnWork Smarter not Harder! #constructionCutting Out an Egress Window in my Basement like a PROBuilding a Massive Work Shop: Ep. 9 Textured Black Metal RoofThe Modest House Build Ep 3: Foundation BracketsWasnt expecting that to happen when hanging drywall in the basementBuilding a Massive Work Shop: Ep. 8 OverhangsEND OF 2024 RRHQ 2.0 Walk Thru TourFULL TRAILER TOUR / Every Tool YOU NEED to run a construction companyPouring a Concrete Pad using the Mud Mixer: HOW DID WE DO?HIKING to 14,000 ft. before my son heads to COLLEGE: Mt. BierstadtFull Porch Build with Hip Roof Details: 40x64 Ep. 9
RR Buildings |

First Time Digging Holes in Over Two Years for a New Horse Barn

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER