Uploaded January 2025 | Updated November 2026, 3 hours ago
Often the weak link in home shop built kitchens is getting a professional finish that looks good and stands up to the wear and tear. Norm teams up with his painter as he sprays on two smooth undercoats followed by a brushed-on finish coat that looks great and should wear well.
Norm begins the process of installing his cabinets. He carefully surveys the existing space, analyzes the conditions, creates a level reference line, and sets the cabinets to floor and wall. Sharing all the tips and techniques learned over many years, Norm puts the cabinets together with the precision and accuracy we've come to expect from this master.
Then, with every appliance installed, every surface polished and prepped, the lights hung, the floor polished, and the stone counters revealed, Norm is able to stand back and enjoy the satisfaction of having created a masterpiece. The Dream Kitchen is finished and open for business.
Season: 20 | Episode: 9
Original Air Date: March 1, 2008
This project does not have a measured drawing:
newyankee.com/episode/finish-and-install
Visit our website at: newyankee.com
_The New Yankee Workshop_ is a co-production of Morash Associates, Inc. and WGBH Boston
#NewYankeeWorkshop #NormAbram #woodworking #howto
Often the weak link in home shop built kitchens is getting a professional finish that looks good and stands up to the wear and tear. Norm teams up with his painter as he sprays on two smooth undercoats followed by a brushed-on finish coat that looks great and should wear well.
Norm begins the process of installing his cabinets. He carefully surveys the existing space, analyzes the conditions, creates a level reference line, and sets the cabinets to floor and wall. Sharing all the tips and techniques learned over many years, Norm puts the cabinets together with the precision and accuracy we've come to expect from this master.
Then, with every appliance installed, every surface polished and prepped, the lights hung, the floor polished, and the stone counters revealed, Norm is able to stand back and enjoy the satisfaction of having created a masterpiece. The Dream Kitchen is finished and open for business.
Season: 20 | Episode: 9
Original Air Date: March 1, 2008
This project does not have a measured drawing:
newyankee.com/episode/finish-and-install
Visit our website at: newyankee.com
_The New Yankee Workshop_ is a co-production of Morash Associates, Inc. and WGBH Boston
#NewYankeeWorkshop #NormAbram #woodworking #howto

![Work Table and Clamp Cart [AI HD] | S14 E7
Surely one of the most useful projects Norms ever built for the shop is this work table. Its a light weight, yet sturdy, assembly table that is easily raised up on casters to move around the shop as necessary. The mechanism for the caster assembly was borrowed from a nearby scenic shop where mobility is essential. Also with the table, Norm creates a storage cart for his collection of woodworkers clamps. When he needs several clamps, he can easily wheel over his collection to make his choice.
_This is an HD version created using an AI program._
Season: 14 | Episode: 7
Original Air Date: February 16, 2002
To purchase the measured drawing:
https://www.newyankee.com/episode/work-table-and-clamp-cart/
Visit our website at: https://www.newyankee.com
_The New Yankee Workshop_ is a co-production of Morash Associates, Inc. and WGBH Boston_
#NewYankeeWorkshop #NormAbram #woodworking #howto Work Table and Clamp Cart [AI HD] | S14 E7](https://i.ytimg.com/vi/tbhv5Pj8FLs/mqdefault.jpg)








