Finish and Install  |  S20 E9 @newyankeeworkshop
Finish and Install  |  S20 E9  @newyankeeworkshop
Uploaded January 2025 | Updated November 2026, 3 hours ago
Often the weak link in home shop built kitchens is getting a professional finish that looks good and stands up to the wear and tear. Norm teams up with his painter as he sprays on two smooth undercoats followed by a brushed-on finish coat that looks great and should wear well.

Norm begins the process of installing his cabinets. He carefully surveys the existing space, analyzes the conditions, creates a level reference line, and sets the cabinets to floor and wall. Sharing all the tips and techniques learned over many years, Norm puts the cabinets together with the precision and accuracy we've come to expect from this master.

Then, with every appliance installed, every surface polished and prepped, the lights hung, the floor polished, and the stone counters revealed, Norm is able to stand back and enjoy the satisfaction of having created a masterpiece. The Dream Kitchen is finished and open for business.

Season: 20 | Episode: 9
Original Air Date: March 1, 2008

This project does not have a measured drawing:
newyankee.com/episode/finish-and-install

Visit our website at: newyankee.com

_The New Yankee Workshop_ is a co-production of Morash Associates, Inc. and WGBH Boston

#NewYankeeWorkshop #NormAbram #woodworking #howto
Finish and Install  |  S20 E9Federal Style Game Table  |  S17 E5Work Table and Clamp Cart [AI HD]  |  S14 E7Project Update: Miter Bench and StorageOutdoor Cupboard  |  S13 E7Outdoor Planters  |  S5 E5The Pantry  |  S20 E5Croquet Set & Bench  |  S12 E4Hall Seat  |  S13 E3English Server  |  S12 E10Tilt Top Table  |  S17 E8Monastery Table  |  S13 E12
The New Yankee Workshop |

Finish and Install | S20 E9

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER