Uploaded March 2024 | Updated September 2026, 3 weeks ago
The fabrication department at Melbourne Polytechnic required more pressure pipe pieces machined and beveled for their weld preparation procedure. There were 180 pieces at 90mm OD with a 6mm wall thickness. Our 2nd year apprentice Jana did a great job presenting as this was her first time in front of the camera.
#haasautomation #cnc #cnclathe #cncmachining #machinist
The fabrication department at Melbourne Polytechnic required more pressure pipe pieces machined and beveled for their weld preparation procedure. There were 180 pieces at 90mm OD with a 6mm wall thickness. Our 2nd year apprentice Jana did a great job presenting as this was her first time in front of the camera.
#haasautomation #cnc #cnclathe #cncmachining #machinist










