Uploaded February 2026 | Updated September 2026, 9 hours ago
This mission by Zagrebtrans d.o.o. continues as the trailer arrives by sea, loaded with a demanding haul. Configured with 12 lines of modular axles and a drawbar, the Faymonville ModulMAX takes on a 180-ton transformer.
The route leads from Bar to Kotor, navigating challenging coastal roads before reaching its final destination: the Lastva substation. This delivery supports the first HVDC (High Voltage Direct Current) system linking the European Union with the Western Balkans — a milestone project powered by precision transport.
This mission by Zagrebtrans d.o.o. continues as the trailer arrives by sea, loaded with a demanding haul. Configured with 12 lines of modular axles and a drawbar, the Faymonville ModulMAX takes on a 180-ton transformer.
The route leads from Bar to Kotor, navigating challenging coastal roads before reaching its final destination: the Lastva substation. This delivery supports the first HVDC (High Voltage Direct Current) system linking the European Union with the Western Balkans — a milestone project powered by precision transport.










