FasTop™ Multi Urethane Flooring Solution at High Altitude Research Lab @SherwinWilliamsPMC
FasTop™ Multi Urethane Flooring Solution at High Altitude Research Lab  @SherwinWilliamsPMC
Uploaded July 2021 | Updated November 2026, 26 minutes ago
The U.S. Army High Altitude Research Lab (HARL) in Pikes Peak, Colorado sees a variable climate as it sits at 14,000+ feet above sea level. Sherwin-Williams was proud to partner with GE Johnson and OmniTech Industries Inc. to install FasTop Multi urethane flooring system at the HARL – an application project in which a combination of onsite technical expertise and customer support were key.

For more information visit: industrial.sherwin-williams.com/na/us/en/resin-flooring
FasTop™ Multi Urethane Flooring Solution at High Altitude Research LabFIRETEX FX6002® Passive Fire ProtectionSteel Armor - Reduce costos en pintura industrial?Engineering Lab Floor Gets Fresh Look and High Durability with Resuflor™ Deco FlakeThe Building Blocks of Lasting Water InfrastructureSherwin-Williams - Falhas no revestimento interno de tanques causam grandes prejuízosSofTop™ Comfort SystemSherwin-Williams FIRETEX® FX9502 Intumescent Fire Protection Application VideoSherwin-Williams Water Tank Color DesignerPintura Intumescente - Elementos sujetos a proteccion final Video#1Pipeclad™ Frac-Shun ERC Overview | A Novel and Innovative Erosion-Resistant Coating SystemSolving Pump Station Coating Challenges at Meridian, Idaho Wastewater Treatment Plant
Sherwin-Williams Protective & Marine |

FasTop™ Multi Urethane Flooring Solution at High Altitude Research Lab

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER