Uploaded July 2021 | Updated November 2026, 26 minutes ago
The U.S. Army High Altitude Research Lab (HARL) in Pikes Peak, Colorado sees a variable climate as it sits at 14,000+ feet above sea level. Sherwin-Williams was proud to partner with GE Johnson and OmniTech Industries Inc. to install FasTop Multi urethane flooring system at the HARL – an application project in which a combination of onsite technical expertise and customer support were key.
For more information visit: industrial.sherwin-williams.com/na/us/en/resin-flooring
The U.S. Army High Altitude Research Lab (HARL) in Pikes Peak, Colorado sees a variable climate as it sits at 14,000+ feet above sea level. Sherwin-Williams was proud to partner with GE Johnson and OmniTech Industries Inc. to install FasTop Multi urethane flooring system at the HARL – an application project in which a combination of onsite technical expertise and customer support were key.
For more information visit: industrial.sherwin-williams.com/na/us/en/resin-flooring










