Extraction of a pile as a result of the hydraulic force applied inside the pile @Deltaresfilm
Extraction of a pile as a result of the hydraulic force applied inside the pile  @Deltaresfilm
Uploaded January 2025 | Updated September 2026, 4 days ago
In this sped-up video, you witness the extraction of a pile as a result of the hydraulic force applied inside the pile. Pile dimensions: 1.5 meter in diameter and 7.5 meter in length (5.5 meter embedded in the soil). The time required for the complete extraction was less than 30 minutes!

Follow us on:
Facebook: facebook.com/DeltaresNL
LinkedIn: nl.linkedin.com/company/deltares
Instagram: instagram.com/deltares
Extraction of a pile as a result of the hydraulic force applied inside the pileDFX: 3D visualization, to get the most out of your simulation results (Trailer)Samenwerkingsconvenant Deltares en Koninklijke NLingenieursDe GeoCentrifugeBregje van WesenbeeckTesting innovations to enhance nature-inclusive design of offshore wind farms - JIP SPREEKlimaatbestendige Stad Toolbox: Introductie en toepassing van de  toolFlow patterns around the Eastern Scheldt tidal turbines during ebbAnimation of the surface flow around floating solar photovoltaic systems FPV with bubble screenHoe sterk is kweldervegetatieDeltares KweldervegetatieGeïntegreerde aanpak voor verzilting
Deltares |

Extraction of a pile as a result of the hydraulic force applied inside the pile

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER