EXPLOSIVES DEMOLITION | Two (2) High-Voltage Transmission Towers @TheLoizeauxGroupLLC
EXPLOSIVES DEMOLITION | Two (2) High-Voltage Transmission Towers  @TheLoizeauxGroupLLC
Uploaded July 2025 | Updated September 2026, 30 minutes ago
Pacific Gas & Electric (PG&E) contacted Silverado Contractors, Inc. (Silverado) regarding the felling of two (2) high-voltage transmission towers on either side of the Sacramento River in Rio Vista, California: Tower 157 at 420’ tall and Tower 158 at 470’ tall. Silverado selected Controlled Demolition Inc. (CDI) to act as the specialty explosives subcontractor to perform the design for and the precision felling of the towers. CDI mobilized to the site on March15, 2025 to oversee structural modifications on CDI-selected tower columns and beams in the lower portion of each tower for subsequent explosives placement. CDI loaded a total of 44 lbs of explosives in the two towers.
EXPLOSIVES DEMOLITION | Two (2) High-Voltage Transmission TowersKinnick Stadium Press Box DemolitionEXPLOSIVES DEMOLITION | 116KW Exhaust StackEXPLOSIVES DEMOLITION | Bridgeport Harbor StationBerkman II Building - Controlled Demolition, Inc.EXPLOSVIES DEMOLITION | Water Street ChimneyForte Towers DemolitionExplosives Demolition Prep #demolitioncrew #concrete #dynamite #hardatwork #demolitionCoal Fired Hung Boiler, Coal Silo Bay, and Ash Silo – Controlled Demolition, Inc.Garfield Towers DemolitionSOUND UP! | Chimney Demolition | #shorts #demolition #saturday #subscribeEXPLOSIVES DEMOLITION | Broadway Building
TheLoizeauxGroupLLC |

EXPLOSIVES DEMOLITION | Two (2) High-Voltage Transmission Towers

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER