Uploaded June 2025 | Updated November 2026, 2 hours ago
The excavator from seggewiss-erdbewegungen.de
Excavator KMC 600: Maximum torque 1,435 Nm, model Isuzu AQ-6UZ1X, speed Maximum torque 1,500 rpm, type Water-cooled 4-stroke 6-cylinder with common rail direct injection, intake, turbocharger with variable geometry, intercooler, cooled exhaust gas recirculation, aftertreatment, DOC and SCR system, displacement 9.839 l, stroke 145 mm, bore 120 mm, rated power, ISO 9249 (net) 270 kW, speed at rated power 2,000 rpm
Operating weight: 58,000 - 62,000 kg
Drive Separate drive of the chains via a high-torque 2-stage axial piston motor with planetary gear allows counter-rotating Direction of rotation. The multi-disk parking brake is spring-loaded and is released hydraulically. Automatic transmission: fast-slow. Max. driving speed in high gear 4.4 km/h Driving speed in low gear 3.4 km/h Max. traction force 540 kN
Fuel tank 675 l, engine coolant 62 l, engine oil 41 l, slewing gear (each side) 6.5 l, travel drive (each side) 11 l, hydraulic system 510 l, hydraulic oil tank 310 l, DEF/AdBlue tank 95 l
What is being done:
" By Alina Komorek
Work is being carried out on the former Elberfeld heating plant - more precisely: demolition work is being carried out. For a few days now, an excavator has been tearing down the outer wall of the old part of the building. And the public still doesn't know what is actually going to happen here.
The heating plant was shut down in July 2018, and since then the power plant in Korzert and one in Barmen have been supplying the city. In 2019, the site and buildings were then sold to investors whose plans included a hotel and event complex. The explosive thing: The neighboring Bayer AG had also expressed interest in the site, but the contract was awarded to a company that had already invested in a conversion project in a former power plant in Bad Oeynhausen.
Despite repeated inquiries, the "Heizkraftwerk Wuppertal-Elberfeld Vermögensverwaltungsgesellschaft mbH" did not respond in time before the editorial deadline to the question of what was currently happening in the former heating plant.
And Yvonne Peterwerth, spokeswoman for Bayer AG, was not allowed to say much about the current status, except: "We are still interested in the site and are in talks with the owner." The investors' plans could not be implemented for safety reasons due to the direct proximity to the Bayer plant."
Source:
wuppertaler-rundschau.de/stadtteile/heckinghausen-oberbarmen/abrissarbeiten-am-elberfelder-heizkraftwerk-aber-warum_aid-117574273
#ConstructionWorldXiuMeiHe
The excavator from seggewiss-erdbewegungen.de
Excavator KMC 600: Maximum torque 1,435 Nm, model Isuzu AQ-6UZ1X, speed Maximum torque 1,500 rpm, type Water-cooled 4-stroke 6-cylinder with common rail direct injection, intake, turbocharger with variable geometry, intercooler, cooled exhaust gas recirculation, aftertreatment, DOC and SCR system, displacement 9.839 l, stroke 145 mm, bore 120 mm, rated power, ISO 9249 (net) 270 kW, speed at rated power 2,000 rpm
Operating weight: 58,000 - 62,000 kg
Drive Separate drive of the chains via a high-torque 2-stage axial piston motor with planetary gear allows counter-rotating Direction of rotation. The multi-disk parking brake is spring-loaded and is released hydraulically. Automatic transmission: fast-slow. Max. driving speed in high gear 4.4 km/h Driving speed in low gear 3.4 km/h Max. traction force 540 kN
Fuel tank 675 l, engine coolant 62 l, engine oil 41 l, slewing gear (each side) 6.5 l, travel drive (each side) 11 l, hydraulic system 510 l, hydraulic oil tank 310 l, DEF/AdBlue tank 95 l
What is being done:
" By Alina Komorek
Work is being carried out on the former Elberfeld heating plant - more precisely: demolition work is being carried out. For a few days now, an excavator has been tearing down the outer wall of the old part of the building. And the public still doesn't know what is actually going to happen here.
The heating plant was shut down in July 2018, and since then the power plant in Korzert and one in Barmen have been supplying the city. In 2019, the site and buildings were then sold to investors whose plans included a hotel and event complex. The explosive thing: The neighboring Bayer AG had also expressed interest in the site, but the contract was awarded to a company that had already invested in a conversion project in a former power plant in Bad Oeynhausen.
Despite repeated inquiries, the "Heizkraftwerk Wuppertal-Elberfeld Vermögensverwaltungsgesellschaft mbH" did not respond in time before the editorial deadline to the question of what was currently happening in the former heating plant.
And Yvonne Peterwerth, spokeswoman for Bayer AG, was not allowed to say much about the current status, except: "We are still interested in the site and are in talks with the owner." The investors' plans could not be implemented for safety reasons due to the direct proximity to the Bayer plant."
Source:
wuppertaler-rundschau.de/stadtteile/heckinghausen-oberbarmen/abrissarbeiten-am-elberfelder-heizkraftwerk-aber-warum_aid-117574273
#ConstructionWorldXiuMeiHe










