Uploaded September 2017 | Updated September 2026, 6 days ago
Dollywood offers quite the variety of thrills and attractions. When we need a break from the roller coasters and want to rest our legs, we take in a ride on the Dollywood Express! According to Dollywood, itt is "an authentic 110-ton coal-fired steam engine takes you on a breathtaking five-mile journey through the foothills of the Great Smoky Mountains where you'll enjoy pastoral scenery and some of the most beautiful views that nature has to offer."
If you'd like to learn more about what is happening at Dollywood, please check out our most recent articles about the park at coasteraddict.com/tag/Dollywood
Be sure to subscribe to our YouTube channel to get more great video content in the very near future. We also encourage you to connect with us on social media!
Facebook: facebook.com/coasteraddict
Twitter: twitter.com/coaster_addict
Instagram: instagram.com/Coaster_Addict
Dollywood offers quite the variety of thrills and attractions. When we need a break from the roller coasters and want to rest our legs, we take in a ride on the Dollywood Express! According to Dollywood, itt is "an authentic 110-ton coal-fired steam engine takes you on a breathtaking five-mile journey through the foothills of the Great Smoky Mountains where you'll enjoy pastoral scenery and some of the most beautiful views that nature has to offer."
If you'd like to learn more about what is happening at Dollywood, please check out our most recent articles about the park at coasteraddict.com/tag/Dollywood
Be sure to subscribe to our YouTube channel to get more great video content in the very near future. We also encourage you to connect with us on social media!
Facebook: facebook.com/coasteraddict
Twitter: twitter.com/coaster_addict
Instagram: instagram.com/Coaster_Addict



![Twisted Cyclone Construction Tour #1 (Update #7 | Train 2 Unveil)
Massive construction for Twisted Cyclone is taking place at Six Flags Over Georgia in preparation for a spring 2018 opening! The ride will be nearly 100 feet tall and speed across the track at approximately 50mph.
Six Flags Over Georgia hosted a construction tour for media outlets to showcase the progress on the transformation of the former [iconic] Georgia Cyclone roller coaster into this new hybrid roller coaster experience. Construction is on schedule; here are some new figures that we learned during the construction tour:
2:10.The track length is actually 2,600 feet instead of 2,300 feet (as originally described).
3:00 As a result of the post-animation tweaks and recalculation on length, there is about 300 more feet than originally announced, but no additional details are currently available.
3:05 Does more track mean there is a third lap? What did Six Flags Over Georgia say?
5:45 Wood support structure color will be silver-ish gray!
6:50 Ten inversions? Just kidding! 10 moments of air time, but we are okay with RMC having 10 inversions!
8:40 It appears that some of the post-animation tweaks are present in the track sections before the lift hill.
11:01 Track construction will continue throughout the track layout with the last official piece likely being the piece of track right in front of the lift hill once the crane is moved.
14:00 There is still one piece of original track still in place on the old Georgia Cyclone (between the storage shed and the station).
14:50 Will the transfer / storage house stay in place as is?
15:12 There will be a less-obstructed view of Twisted Cyclone when walking from the west parking lot!
15:47 The park will release more information about the tweaks to the original layout design (for the final design) and plaza revamp over the upcoming months.
16:32 Some of the structure is being COMPLETELY rebuilt.
17:30 How do they keep up with the support structure pieces to ensure is being installed in the correct spot?
18:11 This second train was unveiled at the end of the construction tour, and it is red.
19:52 The front of the second train (red coaster) will NOT be on display in 2017 but will likely be out when the park opens in March of 2018.
20:15 Construction is on schedule, and the park expects to open the attraction to the general public on Memorial Day weekend (2018).
20:40 The plaza area in front of the new-for 2018 Twisted Cyclone will be renovated, including a refreshed look for Johnny Rockets.
21:05 Also, most (if not all of the track) will be in place by the time the park opens up for the 2018 season (mid-March), leaving only the electrical, controls, queue area, and testing remaining.
Follow along as Six Flags Over Georgia transforms Georgia Cyclone into Twisted Cyclone
https://www.youtube.com/watch?v=D2At2yZHkdA&list=PL3_n2_i8m44zx8ORh4WSGRrJz0B5ajZW4
Be sure to subscribe to our YouTube channel to get more updates about Twisted Cyclone and related industry news in the very near future. We also encourage you to connect with us on social media!
Facebook: https://www.facebook.com/coasteraddict
Twitter: https://twitter.com/coaster_addict
Instagram: https://www.instagram.com/Coaster_Addict/ Twisted Cyclone Construction Tour #1 (Update #7 | Train 2 Unveil)](https://i.ytimg.com/vi/hN7Ky4wZKao/mqdefault.jpg)