Uploaded June 2025 | Updated September 2026, 2 days ago
After two years of planning, design, and construction, the bridge connecting Zion Lodge (Shuttle Stop #5) to the Emerald Pools Trail system is once again open to visitors, and it took a lot (including moving the bridge with a giant crane!) to get there. Learn all about the project in this video.
Audio Description available at this link: nps.gov/media/video/view.htm?id=77739E0B-ADEE-484A-A508-1F9B910F8025
After two years of planning, design, and construction, the bridge connecting Zion Lodge (Shuttle Stop #5) to the Emerald Pools Trail system is once again open to visitors, and it took a lot (including moving the bridge with a giant crane!) to get there. Learn all about the project in this video.
Audio Description available at this link: nps.gov/media/video/view.htm?id=77739E0B-ADEE-484A-A508-1F9B910F8025










