@elbitsystems
  @elbitsystems
Elbit Systems | Elbit Systems / Sectional Personnel Bridge (SPB) @elbitsystems | Uploaded February 2024 | Updated October 2024, 12 minutes ago.
elbitsystems.com/product/sectional-personnel-bridge

The Sectional Personnel Bridge (SPB) is a modular, mobile bridging system providing an immediate solution for infantry troops or emergency forces to cross over dry or wet gap obstacles by foot.

The SPB is in use in several countries and is combat-proven by the USMC. The SPB can bridge dry gaps up to 36m with no intermediate support. Wet gap bridging requires floats every 20m, with anchoring as needed. The footbridge can be quickly and easily deployed, with no equipment or personnel required on the far bank of the obstacle; a 36m bridge can be assembled within 10 minutes. The bridge can be launched and retrieved from either end.

For more information visit: bit.ly/3IhuSaE

To stay up-to-date with Elbit System's latest videos and news, click the subscribe button and tap the bell to make sure you receive notifications from us.
Elbit Systems / Sectional Personnel Bridge (SPB)Merry Christmas from Elbit SystemsShana Tova from Elbit SystemsON RECORD May 2022Industrial Collaboration at Elbit SystemsElbit Systems at DSEI UK 2023ON RECORD March 2022ื‘ื™ืงื•ืจ ื‘ืืœื‘ื™ื˜ ืžืขืจื›ื•ืช ื™ื‘ืฉื” - ืžื”ื“ื•ืจื” ืžื•ืงื“ืžืช ืขืจื•ืฅ 12ON RECORD - September 2021: FRIENDLY TRAVELON RECORD April 2022: On display in BrazilElbit Systems / Investor Conference 2023 (HEBREW)On Record September 2022: HERMES IN SWITZERLAND

Elbit Systems / Sectional Personnel Bridge (SPB) @elbitsystems

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER