- Near Tesla Giga Nevada @TRIC
- 56-acre campus
- 1 Million Sq ft
- 216 MW

Interesting how both Vantage and EdgeCore are including diesel power generation capabilities. Is this for grid outages only or a planned, continuous operation?

Other nearby AI or data server projects or existing installations.
-Vantage
-Google
-Apple
-Switch
-Tract
-RedwoodEnergy + Crusoe (off-grid using EOL EV batteries)