Apaiss | Dragon CRS-24 inspection by Canadarm2 (SSRMS) before undoking (16/17 jan, 2022) @Apaiss | Uploaded February 2022 | Updated October 2024, 1 minute ago.
SpaceX Dragon CRS-24 inspection by Canadarm2 (SSRMS). Operations of 16/17 Jan, 2022.
Performed before undocking 23 Jan, 2022. In this video there are around 10 hours of robotic operations. The operation showed was speed up 128x. The moments of LOS (loss of signal), part of orbital night and without motions were cut.
*** Correction: the close up pictures at the end of the video was Demo 1, not 2. Inspection done on March 4th, 2019.***
Credits: NASA/Ustream/CSA
Music: How To Train Your Dragon Medley [Piano Tutorial] (Synthesia) _ Ian Yan
SpaceX Dragon CRS-24 inspection by Canadarm2 (SSRMS). Operations of 16/17 Jan, 2022.
Performed before undocking 23 Jan, 2022. In this video there are around 10 hours of robotic operations. The operation showed was speed up 128x. The moments of LOS (loss of signal), part of orbital night and without motions were cut.
*** Correction: the close up pictures at the end of the video was Demo 1, not 2. Inspection done on March 4th, 2019.***
Credits: NASA/Ustream/CSA
Music: How To Train Your Dragon Medley [Piano Tutorial] (Synthesia) _ Ian Yan