Developing a steel prefabricated Accelerated Bridge Construction (ABC) process could save construction time and funding related to Texas Department of Transportation (TxDOT) projects, while keeping safety standards. Working with the Texas A&M Transportation Institute, TxDOT personnel reviewed current standards and practices and decided on which designs would be tested in a lab setting. A final design was chosen, with a guide of detailed plans that meet TxDOT substructure details to be distributed.
For more information on research project 0-7112, check out the TxDOT Research Library project record here:
https://library.ctr.utexas.edu/Presto/content/Detail.aspx?ctID=M2UxNzg5YmEtYzMyZS00ZjBlLWIyODctYzljMzQ3ZmVmOWFl&rID=OTI3&qrs=RmFsc2U=&q=NzExMg==&ph=VHJ1ZQ==&bckToL=VHJ1ZQ==&rrtc=VHJ1ZQ==
For access to all TxDOT research, please visit the TxDOT Research Library at https://ctr.utexas.edu/library/
Developing a steel prefabricated Accelerated Bridge Construction (ABC) process could save construction time and funding related to Texas Department of Transportation (TxDOT) projects, while keeping safety standards. Working with the Texas A&M Transportation Institute, TxDOT personnel reviewed current standards and practices and decided on which designs would be tested in a lab setting. A final design was chosen, with a guide of detailed plans that meet TxDOT substructure details to be distributed.
For more information on research project 0-7112, check out the TxDOT Research Library project record here:
https://library.ctr.utexas.edu/Presto/content/Detail.aspx?ctID=M2UxNzg5YmEtYzMyZS00ZjBlLWIyODctYzljMzQ3ZmVmOWFl&rID=OTI3&qrs=RmFsc2U=&q=NzExMg==&ph=VHJ1ZQ==&bckToL=VHJ1ZQ==&rrtc=VHJ1ZQ==
For access to all TxDOT research, please visit the TxDOT Research Library at https://ctr.utexas.edu/library/