Damian Lockley, Mechanical Design Consultant at Tokamak Energy discusses some of the changes happening on ST40 during the upgrade and the design challenges of accommodating the extra equipment required. He tells us how Solid Edge software is being used to model the whole assembly of ST40 and the wider building so that they can see the details as well as the bigger picture.