DEEP UTILITIES 374F | Part 1 @pushysix
DEEP UTILITIES 374F | Part 1  @pushysix
Uploaded September 2020 | Updated September 2026, 23 minutes ago
Installing deep utilities in a new subdivision is relatively easy; almost any operator who claims they can dig a triple trench can do it. This is because there's nothing else in the ground...yet.

But let's go to an intersection on Vancouver's Westside, Oakridge to be specific. This development began its construction in the 1950's. Since then they have been burying every pipe and cable known to man throughout this intersection.
@hall_constructors
not only has to dig around and expose all of the existing lines, but they have to safely and strategically suspend those lines in the air. After all of that, then they can finally begin to lower the 1350 concrete storm pipe down and in between the many obstacles. It's going deep underneath the maze of existing utilities where the ground will never freeze.

Part 2 will have pipe going in the ground! coming soon
DEEP UTILITIES 374F | Part 1INSIDE THE CAT 385 LMEINSIDE THE NEW D11Dynamic compaction...6015 finds its first bench!!!The New @HitachiConstruction  345 - 7 ExcavatorConcrete vault assemblyFirst time operating a mining excavator | PUSHING THE BUCKET - episode 3pick n mix with cat 308 - Operator Challenge 2019SLOT DOZING in California | D6R XLGrading a Sidewalk Subgrade with a GraderDIRTLIFE PODCAST - Episode 11 | Building Roads, Moving Dirt, and Growing Companies
Pushysix® |

DEEP UTILITIES 374F | Part 1

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER