Decommissioning Challenges at the Molten Salt Reactor Experiment Site is presented by Eric Abelquist and Tommy Morgan of UCOR at Oak Ridge National Lab's Molten Salt Reactor Workshop.

Drivers to Take Decommissioning Action :
▪ MSRE is an aging facility—while S&M provides a measure of risk mitigation, ultimately DOE and stakeholders desire more permanent and lasting decommissioning outcome
▪ Remove/mitigate risk to ongoing ORNL operations/mission; e.g., environmental releases to groundwater
▪ Fuel drain tanks and associated components are protected from groundwater due to sump pumps that must remove groundwater (FDTs are below the natural water table elevation)
▪ Physical barriers including concrete cell walls and stainless steel liner must be maintained to ensure integrity of tanks and piping

Uranium Fuel Recovery - MSRE Fuel Salt:
▪U fuel recovery tasks were completed from 2004 to 2008:
― salts were melted and chemically treated,
― molten salts were fluorinated to remove uranium,
― uranium was condensed into cold traps and transferred to chemical (NaF) traps, and
― NaFtraps loaded with the uranium were transferred to an ORNL building for storage
▪ Fuel salt in two fuel drain tanks and flush salt in flush tank melted for removal using a process known as “pool melt” using a heated probe to melt the salt
▪ Hydrofluorination process conducted by sparging the melted salt with mixture of hydrogen fluoride, hydrogen and helium to restore chemical balance in the salt; ensuring uranium is in the form of UF4

Decommissioning Challenges :
▪ Aging facility/equipment
▪ Challenging working environment due to radiological/hazardous conditions requires personal protective equipment (PPE), special tools, portable maintenance shield (PMS)
▪ Salt waste form... Is there an ultimate disposition pathway/home for waste, like WIPP?

Aging Facility and Equipment :
▪ Potential breach of drain tanks is considered to be highest risk at MSRE
― Would result in F2/HF release, difficult to isolate
― Evaluate need for tank integrity measurements
― Assess extent of tank corrosion on thinning of the tank walls and heat exchanger thimbles
▪ Relying on ventilation system that is original to the facility for safety significant functions
▪ Piping and tubing containing holdup infrequently monitored

Presented 2021-10-12 (Oct 12th, 2021) at Oak Ridge National Lab's Molten-Salt Reactor Workshop.

ORNL MSRW 2021 video playlist:
youtube.com/playlist?list=PLuGiwaUJYEZf1HYXPSGr58ieHNMCjXJxF

ORNL MSRW 2021 PDFs:
msrworkshop.ornl.gov/msr2021
Decommissioning Challenges of MSRE - Eric Abelquist and Tommy Morgan @ ORNL MSRW 2021Molten Salt Reactor Campaign - Dr. Patricia Paviet @ ORNL MSRW 2021Cobalt-604h21m45s00f NoMusic - Disappointing Chemical Kidney Dismissed - Weinberg Knew Required - TR2016aThEC2018 - Thorium Energy Conference 2018 - Group Photo OutdoorsNuSTEM: Nuclear Science, Technology & Education Molten Salt Reactors - Jean Ragusa @ ORNL MSRW 2020Giving Pro-Nuclear Testimony - Alyssa Hayes & Madison Schroder @ TEAC11Misleading Nuclear Vocabulary. Nuclear words are scary. Burn. Nuclear Poisons. Critical. Scram.Kirk Sorensen of Flibe Energy: Thorium Fuel Cycle @ Mississippi PSC Nuclear SummitMark Nelson (@EnergyBants) - Nuclear Power takes Europe off Russian Fossil FuelMolten Salt Reactor Safety Assessment - Dr. David Holcomb @ TEAC12Troels Schönfeldt, Seaborg Technologies CEO at Beer Factory during ThEC2018
Thorium Remix |

Decommissioning Challenges of MSRE - Eric Abelquist and Tommy Morgan @ ORNL MSRW 2021

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER