Once there’s a solid reference point, the outer frame goes in first. The first four blocks are set back about 12" (300 mm) so they stay hidden, which creates a small overhang that can be supported later with blocking. Some of that blocking was added early - timing isn’t critical, as long as it’s done.
You might notice a bit of sag at this stage, but that gets corrected once the rest of the joists and blocking are installed. On a deck this size, pushing an overhang much past 12" (300 mm) isn’t ideal, so a few extra TuffBlocks and more blocking were added for proper support. Not a deal breaker - just part of the learning process. Curious how you would’ve handled it?
Build On.
#buildtuff #tuffblock #DIYCommunity
#deck #deckbuild #decking #lowes #homedepot #deckframe #deckandpatio #deckdesign #professionaldeckbuilders #deckframing
Once there’s a solid reference point, the outer frame goes in first. The first four blocks are set back about 12" (300 mm) so they stay hidden, which creates a small overhang that can be supported later with blocking. Some of that blocking was added early - timing isn’t critical, as long as it’s done.
You might notice a bit of sag at this stage, but that gets corrected once the rest of the joists and blocking are installed. On a deck this size, pushing an overhang much past 12" (300 mm) isn’t ideal, so a few extra TuffBlocks and more blocking were added for proper support. Not a deal breaker - just part of the learning process. Curious how you would’ve handled it?
Build On.