Finished day 3 of the build. Started out by cutting all my solid blocking to strengthen the joists. Found a few other spots that needed reinforcing so cut those up. Then went through joist by joist and nailed each block in place. Once all the blocking was in it was time to start on the subfloor. Glue and nail and 4 hours later it was done.
Day 3 - Joist solid blocking and Subfloor installation Addition Build4 - I love my 4-post lift - 1967 MGB Gas TankSkid re-installation on a Ski Doo Formula Z 583Montreal Action 500 Go Karts 22 - Gas Tank Install Chevy 3500 Bucket TruckCoating ICF Foundation Styrofoam with Tuff IIColumns, Cross Bars and Tops - 4 Post Atlas Garage Pro EXT 8,000 lb Auto Lift InstallationBuilding Custom 24 Travel Rails for the Dynamic Perception Stage Zero Time Lapse DollyPart 3 - Final Dash Board Removal - Chevy Suburban A/C Evaporator15 - Bucket Truck still not 100% but Im done for nowHow to DIY ICF mono pour concrete foundation footings and walls forms2016 Winter Update
My Garage Build |

Day 3 - Joist solid blocking and Subfloor installation Addition Build

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER