Uploaded September 2022 | Updated November 2026, 2 hours ago
To reduce your Energy Efficiency Existing Ship Index (EEXI) score, you might want to agree to reduce your shaft power. But it is better if this can be done digitally rather than mechanically – because you may still need the power for (allowed) safety reasons, such as piracy, ice, rescue operations, weather, or for maintenance.
Datum Electronics has developed a device to do this, which it calls the "Shaft Power Limitation EEXI Shaft Power Acquisition Module" and falls under the IMO ShaPoLi guidelines
The module connects a Shaft Power Meter with the propulsion control system - so if shaft power is going above the agreed limit, propulsion power can be automatically reduced.
It does not require any mechanical changes to the engine, or limit the vessel's operational capabilities.
The module also generates data which can be used as evidence that the agreed shaft power limit was never breached, including reporting at any time interval. Or if the power limit was breached for safety reasons, the justification can be included in the report. The report can also include GPS data, showing the vessel's location during the report period.
To reduce your Energy Efficiency Existing Ship Index (EEXI) score, you might want to agree to reduce your shaft power. But it is better if this can be done digitally rather than mechanically – because you may still need the power for (allowed) safety reasons, such as piracy, ice, rescue operations, weather, or for maintenance.
Datum Electronics has developed a device to do this, which it calls the "Shaft Power Limitation EEXI Shaft Power Acquisition Module" and falls under the IMO ShaPoLi guidelines
The module connects a Shaft Power Meter with the propulsion control system - so if shaft power is going above the agreed limit, propulsion power can be automatically reduced.
It does not require any mechanical changes to the engine, or limit the vessel's operational capabilities.
The module also generates data which can be used as evidence that the agreed shaft power limit was never breached, including reporting at any time interval. Or if the power limit was breached for safety reasons, the justification can be included in the report. The report can also include GPS data, showing the vessel's location during the report period.










