Uploaded July 2009 | Updated November 2026, 3 hours ago
The first layer of Satanite needs to be cured in multiple short burns of the forge. This is the 5-minute burn. A 30-minute long run of the forge is still missing to completely cure the Satanite. After a few more layers of Satanite, the walls will be coated with ITC-100 and the floor will be cast from a high alumina refractory. With similarly insulated doors, the forge can reach welding temperatures easily.
The first layer of Satanite needs to be cured in multiple short burns of the forge. This is the 5-minute burn. A 30-minute long run of the forge is still missing to completely cure the Satanite. After a few more layers of Satanite, the walls will be coated with ITC-100 and the floor will be cast from a high alumina refractory. With similarly insulated doors, the forge can reach welding temperatures easily.










