Crossrail railway systems: Powering Britain’s newest railway @CrossrailLtd
Crossrail railway systems: Powering Britain’s newest railway  @CrossrailLtd
Uploaded July 2017 | Updated November 2026, 1 day ago
A dedicated team of engineers is working around the clock to install the 2 x25kV overhead traction power system.

Each Elizabeth line train will draw power in the tunnels from the rigid overhead catenary system’s aluminium alloy conductor bar which houses copper contact wire. These bars are currently being installed in 10-metre sections.

The route will pass through 40 stations from Reading and Heathrow in the west, through new twin-bore 21 km tunnels to Shenfield and Abbey Wood in the east. The Transport for London (TfL) run railway will be named the Elizabeth line when services through central London open in December 2018.

For more information visit: crossrail.co.uk

Video released in 2017
Crossrail railway systems: Powering Britain’s newest railwayCrossrail shorts: Whitechapel station updateCrossrail Shorts: Chloe Etheridge, Assistant EngineerCrossrail Dynamic Testing (August 2019)Railway Progress: Tottenham Court Road (May 2021)Progress Update (August 2019)Station Progress: Whitechapel (July 2019)Platform for design: Whitechapel StationDesign & Architecture: Custom House Elizabeth line stationProgress Update (March 2022)Railway Progress: Hanwell (February 2021)Crossrail: The Secret Life of a Megaproject