Crane C1 tested in wind tunnel @iterorganization
Crane C1 tested in wind tunnel  @iterorganization
Uploaded October 2018 | Updated November 2026, 2 days ago
Crane C1, the shortest (~50 metres under the hook) of the five tower cranes operating inside the ITER Tokamak Complex is getting a 10-metre extension in order to be compatible with the new, faster, "phasing sequence". Prior to installation, a mockup of the crane was tested in a wind tunnel that reproduces the local "wind effects" in the Tokamak Building.
Crane C1 tested in wind tunnelA baseline? Heres what that means for ITERITER by drone - late 2023 (subtitle version)ITER Open Doors Day, March 2026President Xi Jinping explains ITERCelebration for the completion of the first ITER central solenoid moduleThe JT-60SA tokamak comes on lineCentral solenoid goes full stackITER Itinerary SlideshowWHAT IT TAKES TO LIGHT A STARVacuum Vessel Sector # 6 transferred to sub-assembly toolTitan moves its little finger
iterorganization |

Crane C1 tested in wind tunnel

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER