Uploaded May 2026 | Updated September 2026, 1 week ago
World of Minecraft continues to gather pace at Chessington World of Adventures.
With the site structures really taking shape, further track has arrived and been installed on site. This includes the drop out of the "special element" down towards the launch track to go out of the building. In addition main building structure, especially over the station is also really taking shape.
Ground work around the site can really only be seen from the rides, however the amount of concrete down is crazy, although nothing else is on site yet to be installed.
#minecraftworld #chessington #themepark
___________________________
UK Theme Park Awards 2025
Best Established Content Creator - BRONZE: UK Theme Parks
___________________________
🌐: Tik Tok with us! - tiktok.com/@uk_theme_parks
📸: Facebook - facebook.com/UKThemepark
🐤: UK Theme Parks on X - https://x.com/Themeuk
___________________________
Have an enquiry or want to colab?: Press@themeuk.net
World of Minecraft continues to gather pace at Chessington World of Adventures.
With the site structures really taking shape, further track has arrived and been installed on site. This includes the drop out of the "special element" down towards the launch track to go out of the building. In addition main building structure, especially over the station is also really taking shape.
Ground work around the site can really only be seen from the rides, however the amount of concrete down is crazy, although nothing else is on site yet to be installed.
#minecraftworld #chessington #themepark
___________________________
UK Theme Park Awards 2025
Best Established Content Creator - BRONZE: UK Theme Parks
___________________________
🌐: Tik Tok with us! - tiktok.com/@uk_theme_parks
📸: Facebook - facebook.com/UKThemepark
🐤: UK Theme Parks on X - https://x.com/Themeuk
___________________________
Have an enquiry or want to colab?: Press@themeuk.net










