Cavitex C5 Link Expressway Segment 2 FIRST DRIVE THRU and Inauguration 06.21.2024 @dmitrivalencia
Cavitex C5 Link Expressway Segment 2 FIRST DRIVE THRU and Inauguration 06.21.2024  @dmitrivalencia
Uploaded June 2024 | Updated September 2026, 3 weeks ago
To understand the entry and exit points of the #CavitexC5Link Expressway segment 2, we have prepared this drive thru video of what to expect. The 1.9km segment 2 connects Cavitex R-1 Interchange (Coastal Road) from Sucat Road Interchange with access exits to C5 Road Extension and temporarily to Dr A Santos Avenue. The Sucat Interchange will replace the existing Kabihasnan Toll Plaza once it starts to collect toll fees.

The traffic scheme will be announced by the Cavitex official facebook page. All that remain is the segment 3b and once 3b is complete, C5 road will be officially connected to Cavitex.

Segment 2 is opening on July 23, 2024 at 6:00pm

Special Thanks to Admin Rx for volunteering to be the voice over.

#CIC #MPTSouth #PEATC #PRA #DPWH #CRBC #MPTC #TRB
Cavitex C5 Link Expressway Segment 2 FIRST DRIVE THRU and Inauguration 06.21.2024CALAX FINAL Girder Installation - EB 4 Girder installationFirst Drive - NLEX Candaba 3rd Viaduct Zone 1 - NOW OPEN!Pinoy Joyride - Manila joyride (Checking Lagusnilad)NAIA Expressway Ramp update as of April 2023Neo Mega Manila in depth tour (Cities Skyline)CALAX subsection 4 update as of April 2023#CLLEX - update on Cabanatuan Interchange and  Caalibangbangan area. #dpwhNLEX Connector section 1 Opening this month!NLEX 8.2 Section 1A - Pier 7 and 8 girder launching (complete)CALAX subsection 3 2 and 1 update as of March 2024LRT 1 Cavite Extension Phase 1 - NOW OPEN (11.16.2024)
dmitrivalencia |

Cavitex C5 Link Expressway Segment 2 FIRST DRIVE THRU and Inauguration 06.21.2024

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER